Agilent Technologies
G6600-90006
manual
NCD Tube Replacement Detail
Troubleshooting
Specifications
Install
Schematic for 355 SCD
Signal Controls
Warranty
Maintenance
Solving Detector Problems
Set Up the Vacuum Pump
Burner Assembly Detail
Page 104
Figure 45
NCD Tube Replacement Detail
Figure 46
NCD Tube Replacement Detail
15
The assembled Burner is now ready for
re-installation
on the GC, including column placement.
104
Operation and Maintenance Manual
Page 103
Page 105
Image 104
Page 103
Page 105
Contents
Operation and Maintenance Manual
Warranty
Safety Notices
Acknowledgements
Manual Part Number
English
WA R N I N G
Is not in use
Español
Français
Deutsch
Italiano
Dutch
Veiligheidsvoorzieningen niet meer
Following symbols are used on the equipment
Contents
Installation
Overview
Front Panel Controls and Initial Startup
Operation
Maintenance
Pump Maintenance
Troubleshooting
Index
Operation and Maintenance Manual
Introduction
Operation and Maintenance Manual
System Description
Technical Information 255 NCD
Specifications
Technical Information 355 SCD
Physical Specifications
Power requirements
Voltage
Nitrogen Chemiluminescence Detector
Theory of Operation
Sulfur Chemiluminescence Detector
Dual Plasma Controller
Dual Plasma Burner with the 355 SCD
Description of Major Components
Dual Plasma Burner
Cross-Section of the Dual Plasma Burner for the 355 SCD
Cross-Section of the Dual Plasma Burner for the 255 NCD
Ozone Generator
Chemiluminescence Reaction Cell and Photomultiplier Tube
355 SCD Left Side
355 SCD Right Side
255 NCD Left Side View
Pressure Transducer
Vacuum Pump
Chemical Trap
Oil Coalescing Filter
FID Adapter Optional
NCD Reaction Cell
NCD Photomultiplier Tube and Cooler
Schematic for 355 SCD
Schematic for 255 NCD, in Nitrogen Mode
Schematic for 255 NCD, in Nitrosamine Mode
Operation and Maintenance Manual
Installation
Overview
Power Requirements
Selecting a Location
Environmental Considerations
Combustion Gas Requirements
Two-stage pressure regulators
Venting Gases
Required Installation Tools
Unpack and Inspect the Instrument
Set Up the Vacuum Pump
Installing the Edwards RV5 Pump Oil-Sealed Vacuum Pump
WA R N I N G
Ard
RV5 Oil-Sealed Vacuum Pump and Associated Traps Front Side
RV5 Oil- Sealed Vacuum Pump and Associated Traps Top
Setting the Gas Ballast Position RV5
Installing the Welch Dry Piston Vacuum Pump
Operation Notes Welch Pump
Welch Dry Piston Pump
Operation and Maintenance Manual
Connect the Power Cord
SCD 230 V Unit Rear Panel Diagram
Install the Dry Compressed Air or O2 Supply
Install the Signal Output Cables
Install the Dual Plasma Burner
Additional information
Install the Dual Plasma Controller
Dual Plasma Controller Rear Panel
Packed Columns and Columns with an Outside Diameter 0.8 mm
Install Column Connections
Capillary Columns
Install the Transfer Line
Front Panel Controls and Initial Startup
Power Controls
Detector Front Panel Controls
Signal Controls
Display Output Controls
Dual Plasma Controller Controls
Dual Plasma Controller Front Panel
Initial Startup
Vacuum Test
Recorder Test
Detector Interface Setup
Initial Checkout
Ignition
Operation
Start-Up Procedure
Detector Operation
Detector Stability and Response
Column Bleed
Coking
Contaminated Gases
Fluctuating Pressures
Typical Operating Conditions
Typical Operating Conditions
Detection Limits
Expected Detection Limits for Chromatographic Conditions
Complete Shutdown
Instrument Shut-Down
Daily Shutdown
Using the 255 NCD in Nitrosamine Mode
Special Operating Modes
Operation and Maintenance Manual
Operation and Maintenance Manual
Maintenance
Pump Maintenance
Operating Life of Components for Edwards RV5 Vacuum Pump
Cleaning the Detector
Changing the Oil Mist Filter RV5
Reaction Cell Cleaning
Equipment
Reaction Cell, PMT Housing and PMT Socket
WA R N I N G
Flow Sensor Calibration
Detector Sensitivity
MDL
SCD
Proper Ferrule Orientation to the Large Ceramic Tube
Orientation of the Double Taper Ferrule
Tightening the Heater Swivel Nut
Operation and Maintenance Manual
NCD
Proper Ferrule Orientation to the Large Quartz Tube
Burner Assembly Detail
Tube Replacement for the SCD
Positioning the Upper Tube in the Union Fitting
100 Operation and Maintenance Manual
Operation and Maintenance Manual 101
Tube Replacement for the NCD
Operation and Maintenance Manual 103
NCD Tube Replacement Detail
Troubleshooting
Solving Detector Problems
Power Problems
Detector Fuse
Vacuum Pump Fuse
Dual Plasma Controller Fuses
Fuse Positions on the Power Supply Board
Ozone Generation Problems
High Voltage Transformer
Plugged Restrictor Lines
Response Problems
Temperature Reading Problems
Diagnosing General Problems
Troubleshooting Detector Issues
Detector gases
Troubleshooting Pump Issues
Troubleshooting Burner Issues
Index
Agilent Technologies, Inc
Related pages
All Placement page
Emplacement des numéros de modèle et de série for Frigidaire 318201822
Separation Pad & Paper Feed Roller Removal/Replacement for Canon RG1-1788
Procedure for Functional Check Replacement Components for American Dryer Corp ML-175DR
Replacement parts for GE SG Series
Ordering replacement filters for Samsung Refrigerator
Speaker placement for Sherwood RD-7106
Fonction de déplacement for Samsung NP-R20F002/SEF
Ordering Replacement Parts Centrals for Desa CGB35P
Déplacement du nettoyeur haute pression for Homelite HL252300
Staple cartridge replacement and staple jam removal for Sharp AR-M451N
Where can I find additional information about the MIC Series 550 camera?
Explore the user manual here
Top
Page
Image
Contents