| | | | | | | |
Step 1: Selecting a Location | 41 | | | | | |
Power Requirements | 41 | | | | | | |
| 42 |
| 42 | | | | |
| 42 | | | | |
Step 2: Unpack and Inspect the Instrument | 45 | | |
Required Installation Tools | 45 | | | | |
Step 3: Set Up the Vacuum Pump | 46 | | | | |
Installing the Edwards RV5 Pump Oil-Sealed Vacuum Pump 46 | |
| 49 |
| 49 |
| |
| |
Installing the Welch Dry Piston Vacuum Pump | 52 | |
| 54 | | |
| 54 | |
| 56 | | | | |
| 56 | | |
| |
Step 6: Install the Signal Output Cables | 58 | | |
Standard Cable Connection | 58 | | | | |
HP 3390 Series Integrator Cable Connection | 58 | |
HP 3396 Integrator Cable Connection | | 58 | | |
HP 5890 GC Analog Input Board | 58 | | | | |
Agilent 6890 GC Analog Input Board | | 58 | | |
Step 7: Install the Dual Plasma Burner | 59 | | |
| 59 | |
Step 8: Install the Dual Plasma Controller | | 60 | | |
| 60 | |
| 61 | | | | |
| 61 | | | | | | |
| 61 | | |