Agilent 355 Sulfur and 255 Nitrogen Chemiluminescence Detectors Operation and Maintenance Manual
3 Installation
Overview 40
Step 1: Selecting a Location 41
Step 2: Unpack and Inspect the Instrument 45
Step 3: Set Up the Vacuum Pump | 46 |
Step 4: Connect the Power Cord | 56 |
Step 5: Install the Dry Compressed Air or O2 Supply 57
Step 6: | Install the Signal Output Cables | 58 |
Step 7: | Install the Dual Plasma Burner | 59 |
Step 8: Install the Dual Plasma Controller 60
Step 9: Install Column Connections 61
Step 10: Install the Transfer Line 62
Agilent Technologies | 39 |