Agilent Technologies G6600-90006 manual Initial Startup, Vacuum Test

Page 67

Controller Status

Illuminate to reflect current status. The Power LED

Lights

indicates power is on; the Heater LED indicates

 

temperature set point has been obtained; the Valves

 

LED indicates the solenoid valves open; and the

 

Fault LED indicates a drop in pressure or excessive

 

temperature (see Chapter 7, “Troubleshooting” for

 

details).

Initial Startup

Vacuum Test

With the 1/8" Valco cap on the black PFA transfer line still in place and the air supply to the ozone generator off, set the internal air regulator to 0 psi (fully counterclockwise), and power on the SCD or NCD by plugging the power cord into the house power supply. The SCD and NCD will power up in STANDBY mode, with the pump and the ozone generator OFF. For this test, the desired mode is power ON, vacuum pump ON, ozone generator OFF, display range in the low sensitivity mode and PRESSURE signal displayed. Press the following controls in the order shown in order to start the vacuum pump and to view the reaction cell pressure.

Press until green ON LED is lit

Press until red LED is lit

Press to display reaction cell pressure in torr

After the pressure has stabilized (~5 minutes), record the pressure below. Typical pressure in the reaction cell should be 1-2 torr with the oil-sealed pump, or 5-8 torr for the oil-free pump.

Operation and Maintenance Manual

67

Image 67
Contents Operation and Maintenance Manual Manual Part Number WarrantySafety Notices AcknowledgementsWA R N I N G EnglishIs not in use Español Français Deutsch Italiano Veiligheidsvoorzieningen niet meer DutchFollowing symbols are used on the equipment Contents Overview InstallationOperation Front Panel Controls and Initial StartupPump Maintenance MaintenanceIndex TroubleshootingOperation and Maintenance Manual Introduction Operation and Maintenance Manual System Description Technical Information 355 SCD SpecificationsTechnical Information 255 NCD Power requirements Physical SpecificationsVoltage Sulfur Chemiluminescence Detector Theory of OperationNitrogen Chemiluminescence Detector Dual Plasma Burner with the 355 SCD Dual Plasma ControllerDual Plasma Burner Description of Major ComponentsCross-Section of the Dual Plasma Burner for the 355 SCD Cross-Section of the Dual Plasma Burner for the 255 NCD Chemiluminescence Reaction Cell and Photomultiplier Tube Ozone Generator355 SCD Left Side 355 SCD Right Side 255 NCD Left Side View Vacuum Pump Pressure TransducerNCD Reaction Cell Chemical TrapOil Coalescing Filter FID Adapter OptionalNCD Photomultiplier Tube and Cooler Schematic for 355 SCD Schematic for 255 NCD, in Nitrogen Mode Schematic for 255 NCD, in Nitrosamine Mode Operation and Maintenance Manual Installation Overview Selecting a Location Power RequirementsCombustion Gas Requirements Environmental ConsiderationsTwo-stage pressure regulators Venting Gases Unpack and Inspect the Instrument Required Installation ToolsInstalling the Edwards RV5 Pump Oil-Sealed Vacuum Pump Set Up the Vacuum PumpWA R N I N G Ard RV5 Oil-Sealed Vacuum Pump and Associated Traps Front Side RV5 Oil- Sealed Vacuum Pump and Associated Traps Top Setting the Gas Ballast Position RV5 Installing the Welch Dry Piston Vacuum Pump Operation Notes Welch Pump Welch Dry Piston Pump Operation and Maintenance Manual SCD 230 V Unit Rear Panel Diagram Connect the Power CordInstall the Dry Compressed Air or O2 Supply Install the Signal Output Cables Additional information Install the Dual Plasma BurnerDual Plasma Controller Rear Panel Install the Dual Plasma ControllerCapillary Columns Install Column ConnectionsPacked Columns and Columns with an Outside Diameter 0.8 mm Install the Transfer Line Front Panel Controls and Initial Startup Detector Front Panel Controls Power ControlsDisplay Output Controls Signal ControlsDual Plasma Controller Front Panel Dual Plasma Controller ControlsVacuum Test Initial StartupRecorder Test Initial Checkout Detector Interface SetupIgnition Operation Start-Up Procedure Coking Detector OperationDetector Stability and Response Column BleedFluctuating Pressures Contaminated GasesTypical Operating Conditions Typical Operating ConditionsExpected Detection Limits for Chromatographic Conditions Detection LimitsDaily Shutdown Instrument Shut-DownComplete Shutdown Special Operating Modes Using the 255 NCD in Nitrosamine ModeOperation and Maintenance Manual Operation and Maintenance Manual Maintenance Operating Life of Components for Edwards RV5 Vacuum Pump Pump MaintenanceCleaning the Detector Changing the Oil Mist Filter RV5 Equipment Reaction Cell CleaningReaction Cell, PMT Housing and PMT Socket WA R N I N G Flow Sensor Calibration MDL Detector SensitivitySCD Proper Ferrule Orientation to the Large Ceramic Tube Orientation of the Double Taper Ferrule Tightening the Heater Swivel Nut Operation and Maintenance Manual NCD Proper Ferrule Orientation to the Large Quartz Tube Burner Assembly Detail Tube Replacement for the SCD Positioning the Upper Tube in the Union Fitting 100 Operation and Maintenance Manual Operation and Maintenance Manual 101 Tube Replacement for the NCD Operation and Maintenance Manual 103 NCD Tube Replacement Detail Troubleshooting Solving Detector Problems Dual Plasma Controller Fuses Power ProblemsDetector Fuse Vacuum Pump FuseFuse Positions on the Power Supply Board High Voltage Transformer Ozone Generation ProblemsPlugged Restrictor Lines Response Problems Temperature Reading Problems Troubleshooting Detector Issues Diagnosing General ProblemsDetector gases Troubleshooting Pump Issues Troubleshooting Burner Issues Index Agilent Technologies, Inc