Fujitsu RX330 manual Safety

Page 24

Safety

Important information

VCAUTION!

Proper operation of the system (in accordance with IEC 60950-1/ EN 60950-1) is only ensured if the casing is completely assembled and the rear covers for the installation slots have been fitted (electric shock, cooling, fire protection, interference suppression).

Only install system expansions that satisfy the requirements and rules governing safety and electromagnetic compatibility and those relating to telecommunication terminals. If you install other expan- sions, they may damage the system or violate the safety regulations. Information on which system expansions are approved for installation can be obtained from our customer service center or your sales outlet.

The components marked with a warning notice (e.g. lightning symbol) may only be opened, removed or exchanged by authorized, qualified personnel. Exception: hot-pluggable power supply units can be replaced.

The warranty is void if the server is damaged during installation or replacement of system expansions.

Only set screen resolutions and refresh rates that are specified in the operating manual for the monitor. Otherwise, you may damage your monitor. If you are in any doubt, contact your sales outlet or customer service center.

24

Operating manual

RX330 S1

Image 24
Contents Primergy RX330 S1 Server Comments… Suggestions… Corrections… Copyright and TrademarksCertified documentation according to DIN EN ISO Contents Contents Abbreviations Literature Index Page Introduction Documentation overviewConcept and target groups for this manual Documentation overview Additional server documentationFeatures IntroductionFurther sources of information System boardFeatures Accessible drivesPower supply USB portIRMC with integrated service LAN port Features Server management Service and support ServerStartRemoteView Notational conventions Notational conventionsTechnical data Electrical data hot-plug power supply unitCompliance with regulations and standards Technical data WeightMechanical values Ventilation clearanceInstallation steps, overview Installation steps, overview Safety Important informationSafety Installation and operationBefore starting up Important information Safety Working with CDs/DVDs and CD/DVD drives Laser informationNever remove parts of the CD/DVD drive casing Batteries Modules with Electrostatic-Sensitive Devices ESD labelCE conformity FCC Class a Compliance StatementCE conformity Other important informationTransporting the server Important information Environmental protection Environmentally-friendly product design and developmentEnergy-saving information Packaging informationEnvironmental protection Labels on plastic casing partsReturns, recycling and disposal Hardware installation Minimum acclimatization timeHours Unpacking the server Unpacking the serverInstalling/removing the server in/from the rack Rack requirementsInstalling/removing the server in/from the rack Primecenter RackDataCenter Rack Operating manual Mechanical requirements Installation in PRIMECENTER/DataCenter Rack Fitting the support bracketRemove the outer telescopic rail Operating manual Installation in 3rd party racks Racks with installation depth of 735 mmInserting the server Preparing the serverInserting the server Connecting devices to the server Hardware installationConnecting devices to the server Connecting the keyboard, mouse and monitorConnecting the server to the mains Connecting the server to the mainsConnecting cables Disconnecting cablesStarting up and operation Controls and displaysFront of server Indicators on the control panel Controls and displaysControls Indicators on the drives CD/DVD indicator Starting up and operationIndicators on the HDD module LEDGlobal error indicator and ID indicator Rear of serverIndicators on the connection panel LAN indicators LAN indicatorsHot-plug PSU indicators Status MeaningSwitching the server on and off Switching the server on and offSwitching the server on System already installedSwitching the server OFF Specified switch on time / switch off timeRing indicator After power failureConfiguring the server Configuring onboard SAS controllerConfiguring the server Configuration with ServerStart ServerStart advantagesCleaning the server Configuration without ServerStartCleaning the server Configuring onboard SAS controllerBios Setup security functions Preventing unauthorized Bios Setup callsPreventing unauthorized system access Property and data protectionProtecting Bios from being overwritten Protecting the server from being switched off by a programTroubleshooting and tips Power-on indicator remains unlitPower cable incorrectly connected Power supply overloadedServer switches itself off Screen remains blankFlickering stripes on monitor screen No screen display or display driftsNo mouse pointer displayed on screen System will not boot Mouse controller disabledSAS configuration incorrect Incorrect date and timeDrives reported as dead when starting system Error message on screenRAID controller configuration incorrect RAID controller is not configured for this drivePage Hot-plug power supply units Hot-plug componentsHot-plug power supply units Remove the dummy moduleInstalling/removing the hot-plug power supply unit Hot-plug componentsReplacing the hot-plug power supply unit Hot plug hard disk drives Hot plug hard disk drives HDD module and dummy moduleHandling hard disk drives and HDD modules Removing/Installing the dummy module Removing the dummy moduleInstalling/removing the HDD module Unlocking the HDD moduleInstalling the HDD module Installing the HDD moduleRemoving the HDD module Vcaution Abbreviations Abbreviations IRMC LBA RAM SEL Literature Literature Primergy ServerView Suite ServerView S2 Primergy ServerView Suite ServerViewPrimergy ServerView Suite Index CD-RW DVD-RWIndex DVDUSB Dimensions Electrical data Index