Fujitsu RX330 manual Dimensions Electrical data

Page 92

Index

R

 

Rack

 

requirements

35

telescopic rails

44

RAID controller is not configured for

this drive

67

 

 

 

RAID functionality

10

 

 

RAID level 11

 

 

 

Rating plate

34

 

 

 

Recycling devices

32

 

Redundancy, power supply

10

Remote Storage

11

 

 

RemoteView

14, 15

 

 

Removing, server

35

 

 

Replacing online

79

 

 

Requirements

 

 

 

 

3rd party rack

37

 

 

DataCenter Rack

36

 

PRIMECENTER Rack

36

Reset button

49, 50

 

 

Return of devices

32

 

 

Routing cables 41

 

 

S

 

 

 

 

Safety 21

 

 

 

 

Safety standards

17

 

 

SAS controller

 

 

 

configuring RAID

58

 

IME configuration

58

 

Integrated Mirroring

 

Enhanced

10

 

 

Saving energy

31

 

 

Screen

 

 

 

 

error message

67

 

 

flickering

65

 

 

 

remains blank

64

 

 

shows flickering stripes

65

Security functions

7

 

 

setup password 61

 

system password

61

 

unauthorized access 61

Server

 

 

 

 

ambient conditions

18

 

configuration

14, 58

 

connecting mains voltage

47

dimensions

18

 

 

 

electrical data

17

 

 

 

fitting in rack

35

 

 

 

installation

 

43

 

 

 

 

installing

35

 

 

 

 

noise level

 

18

 

 

 

 

removing

35

 

 

 

 

routing cables

41

 

 

 

service

14

 

 

 

 

 

switches itself off (error)

64

switching off

56

 

 

 

switching on

56

 

 

 

technical data

17

 

 

 

transportation

29

 

 

 

unpacking

34

 

 

 

 

ventilation clearance

18

 

weight

18

 

 

 

 

 

Server management

13

 

ServerStart

14, 59

 

 

 

ServerView

13

 

 

 

 

supported functions

13

 

Service

 

 

 

 

 

 

 

server

14

 

 

 

 

 

 

touch-point

14

 

 

 

 

Service LAN port

11, 45

 

Setting up

49

 

 

 

 

 

Setup password

61

 

 

 

Support bracket

39

 

 

 

Switch off time, defining

57

 

Switch on time, defining

57

 

Switching off, server

56

 

Switching on, server

56

 

System board

 

9

 

 

 

 

System does not boot

 

66

 

System password

61

 

 

 

T

 

 

 

 

 

 

 

Target group

7

 

 

 

 

 

Technical data

 

17

 

 

 

 

Telescopic rail

 

41

 

 

 

 

Telescopic rails

44

 

 

 

Time, incorrect

66

 

 

 

Touch-point

14

 

 

 

 

92

Operating manual

RX330 S1

Image 92
Contents Primergy RX330 S1 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Copyright and Trademarks Contents Contents Abbreviations Literature Index Page Concept and target groups for this manual IntroductionDocumentation overview Documentation overview Additional server documentationFeatures IntroductionFurther sources of information System boardFeatures Accessible drivesPower supply USB portIRMC with integrated service LAN port Features Server management Service and support ServerStartRemoteView Notational conventions Notational conventionsCompliance with regulations and standards Technical dataElectrical data hot-plug power supply unit Technical data WeightMechanical values Ventilation clearanceInstallation steps, overview Installation steps, overview Safety Important informationBefore starting up SafetyInstallation and operation Important information Safety Never remove parts of the CD/DVD drive casing Working with CDs/DVDs and CD/DVD drivesLaser information Batteries Modules with Electrostatic-Sensitive Devices ESD labelCE conformity FCC Class a Compliance StatementCE conformity Other important informationTransporting the server Important information Environmental protection Environmentally-friendly product design and developmentEnergy-saving information Packaging informationReturns, recycling and disposal Environmental protectionLabels on plastic casing parts Hours Hardware installationMinimum acclimatization time Unpacking the server Unpacking the serverInstalling/removing the server in/from the rack Rack requirementsDataCenter Rack Installing/removing the server in/from the rackPrimecenter Rack Operating manual Mechanical requirements Installation in PRIMECENTER/DataCenter Rack Fitting the support bracketRemove the outer telescopic rail Operating manual Installation in 3rd party racks Racks with installation depth of 735 mmInserting the server Preparing the serverInserting the server Connecting devices to the server Hardware installationConnecting devices to the server Connecting the keyboard, mouse and monitorConnecting the server to the mains Connecting the server to the mainsConnecting cables Disconnecting cablesFront of server Starting up and operationControls and displays Controls Indicators on the control panelControls and displays Indicators on the drives CD/DVD indicator Starting up and operationIndicators on the HDD module LEDGlobal error indicator and ID indicator Rear of serverIndicators on the connection panel LAN indicators LAN indicatorsHot-plug PSU indicators Status MeaningSwitching the server on and off Switching the server on and offSwitching the server on System already installedSwitching the server OFF Specified switch on time / switch off timeRing indicator After power failureConfiguring the server Configuring the serverConfiguring onboard SAS controller Configuration with ServerStart ServerStart advantagesCleaning the server Configuration without ServerStartCleaning the server Configuring onboard SAS controllerBios Setup security functions Preventing unauthorized Bios Setup callsPreventing unauthorized system access Property and data protectionProtecting Bios from being overwritten Protecting the server from being switched off by a programTroubleshooting and tips Power-on indicator remains unlitPower cable incorrectly connected Power supply overloadedServer switches itself off Screen remains blankNo mouse pointer displayed on screen Flickering stripes on monitor screenNo screen display or display drifts System will not boot Mouse controller disabledSAS configuration incorrect Incorrect date and timeDrives reported as dead when starting system Error message on screenRAID controller configuration incorrect RAID controller is not configured for this drivePage Hot-plug power supply units Hot-plug componentsHot-plug power supply units Remove the dummy moduleInstalling/removing the hot-plug power supply unit Hot-plug componentsReplacing the hot-plug power supply unit Hot plug hard disk drives Hot plug hard disk drives HDD module and dummy moduleHandling hard disk drives and HDD modules Removing/Installing the dummy module Removing the dummy moduleInstalling/removing the HDD module Unlocking the HDD moduleInstalling the HDD module Installing the HDD moduleRemoving the HDD module Vcaution Abbreviations Abbreviations IRMC LBA RAM SEL Literature Primergy ServerView Suite Literature Primergy ServerView Suite ServerView S2Primergy ServerView Suite ServerView Index CD-RW DVD-RWIndex DVDUSB Dimensions Electrical data Index