Installing/removing the server in/from the rack | Hardware installation |
1 | 2 |
|
1
Figure 4: Remove the outer telescopic rail
ÊExtend the telescopic rail fully (1).
ÊPress the release spring (2) and remove the server rail.
ÊRepeat both steps with the second telescopic rail.
INo nuts are required to secure the telescopic rails as the fixing holes on the rails are threaded.
40 | Operating manual | RX330 S1 |