Allied Telesis AT-FAN06, AT-PWR06, AT-DC2552XS manual Reviewing Safety Precautions

Page 35

Stack Installation Guide for AT-2552XS L2 Data Center Switch

Reviewing Safety Precautions

Please review the following safety precautions before you begin to install the switch.

Note

The indicates that a translation of the safety statement is available in a PDF document titled “Translated Safety Statements”.

Warning

Class 1 Laser product. L1

Warning

Do not stare into the laser beam. L2

Warning

Do not look directly at the fiber optic cable ends or inspect the cable ends with an optical lens. L6

Warning

To prevent electric shock, do not remove the cover. No user- serviceable parts inside. This unit contains hazardous voltages and should only be opened by a trained and qualified technician. To avoid the possibility of electric shock, disconnect electric power to the product before connecting or disconnecting the LAN cables. E1

Warning

Do not work on equipment or cables during periods of lightning activity. E2

Warning

Power cord is used as a disconnection device. To de-energize equipment, disconnect the power cord. E3

35

Image 35
Contents Installation Guide Page Tick Electrical Safety and Emissions StandardsTranslated Safety Statements Contents Page Figures Figures Tables Tables Preface Document Conventions Contacting Allied Telesis Preface Chapter OverviewFunctions AT-DC2552XS FeaturesInstallation Options  AT-QSFPSR 40GBASE-SR4 MPO Optional QSFP+ TransceiversLED FAN LEDAT-DC2552XS Rear Panel Stack Installation Guide for AT-2552XS L2 Data Center Switch Cable Type 10Mbps 100Mbps 1000Mbps LED LEDsQSFP+ LEDs QSFP+ LED is described in Table Fault PowerLink Link ACT LEDFAN2 FAN1AC OK Console Port AT-PWR06 Power Supply Module Stack Installation Guide for AT-2552XS L2 Data Center Switch AT-FAN06 Fan Module Beginning the Installation Step Procedure Installation OverviewReviewing Safety Precautions Beginning the Installation Stack Installation Guide for AT-2552XS L2 Data Center Switch Beginning the Installation Planning the Installation AT-DC2552XS Switch Unpacking the SwitchAT-PWR06 Power Supply AT-FAN06 Fan Module Installing the Switch and Modules Installing the Switch on a Desktop Possible Bracket Locations Installing the Switch in an Equipment RackInstalling the Switch and Modules Mounting the Switch in an Equipment Rack Installing Power Supply Module Installing and Replacing AT-PWR06 Power Supply ModuleInsert AT-PWR06 Module Into Chassis Tighten AT-PWR06 Captive Screws Replacing Power Supply ModuleInstalling Power Supply Blank Cover Installing Fan Module Installing and Replacing AT-FAN06 Fan ModuleStack Installation Guide for AT-2552XS L2 Data Center Switch Replacing Fan Module Installing the SFP+ and QSFP+ Transceivers and Cables 10GBASE-LR Installing SFP+ Transceivers and Cables10GBASE-SR AT-SP10SRInstalling SFP+ Transceiver Removing SFP+ Dust Cover Installing a SFP+ Direct Attach Cables Installing the SFP+ and QSFP+ Transceivers and Cables AT-QSFPSR Installing QSFP+ Transceivers and Cables40GBASE-SR4 Installing the SFP+ and QSFP+ Transceivers and Cables QSFP+ Mthtp Installing the SFP+ and QSFP+ Transceivers and Cables Powering the Switch Powering On the Switch Stack Installation Guide for AT-2552XS L2 Data Center Switch Turn Off the switch Managing the Switch Local Management Connecting the Console PortStack Installation Guide for AT-2552XS L2 Data Center Switch Remote Network Management NET Mgmt Cable InstallationStack Installation Guide for AT-2552XS L2 Data Center Switch Managing the Switch Troubleshooting Troubleshooting Stack Installation Guide for AT-2552XS L2 Data Center Switch Troubleshooting Appendix a Technical SpecificationsPhysical Specifications Environmental SpecificationsMtbf Power SpecificationsCertifications Quality and ReliabilityTX+ RX+ RJ-45 Twisted Pair Port PinoutsPinout Pair Stack Installation Guide for AT-2552XS L2 Data Center Switch Appendix a Technical Specifications