Chapter 4: Installing the SFP+ and QSFP+ Transceivers and Cables
Figure 31. Removing QSFP+ Slot Dust Cover
3.If you are installing the transceiver in the top QSFP+ slot, position the transceiver with the Allied Telesis handle facing up. If you are installing the transceiver in the bottom slot, position the transceiver with the handle facing down.
4.Slide the module into the slot until it clicks into place. See Figure 32.
Figure 32. Installing an QSFP+ Transceiver
5. Repeat steps 1 - 4 if you have other QSFP+ transceivers to install.
Note
If you are ready to attach the fiber optic cable to the transceiver, continue with the next step. Otherwise, repeat steps 1 to 4 to install the remaining QSFP+ transceiver(s) in the line cards. Do not remove the dust cover from the installed QSFP+ transceiver until you are ready to install the fiber optic cable.
6.Remove the dust cover from the transceiver. See Figure 33 on page 63.
62