Allied Telesis AT-FAN06 manual Power Specifications, Certifications, Quality and Reliability, Mtbf

Page 80

Appendix A: Technical Specifications

Power Specifications

AT-PWR06 Input Specifications

Table 14. AT-PWR06 Input Specifications

Parameter

Specifications

 

 

Voltage

Voltage: 100-240V AC (10% auto-

 

ranging)

 

 

Frequency

50/60 Hz per input

 

 

Maximum Current

16A @ 100V

 

 

Certifications

Table 15. Product Certifications

Parameter

Specifications

 

 

EMI (Emissions)

FCC Class A, EN55022 Class A, VCCI,

 

CISPR 22 Class A, C-TICK

 

 

EMC (Immunity)

EN55024, EN61000-3-2, EN61000-3-3

 

 

Electrical and Laser Safety

EN60950-1 (TUV), UL 60950-1 (CULUS)

Quality and Reliability

Table 16.

MTBF

 

 

Parameter

 

Specifications

 

 

 

AT-DC2552XS L2 Data Center

 

 

Switch with 2 power supplies and 2

 

61,320 hours

fans

 

 

 

 

 

80

Image 80
Contents Installation Guide Page Electrical Safety and Emissions Standards TickTranslated Safety Statements Contents Page Figures Figures Tables Tables Preface Document Conventions Contacting Allied Telesis Preface Overview ChapterAT-DC2552XS Features FunctionsInstallation Options Optional QSFP+ Transceivers  AT-QSFPSR 40GBASE-SR4 MPOLED LED FANAT-DC2552XS Rear Panel Stack Installation Guide for AT-2552XS L2 Data Center Switch Cable Type 10Mbps 100Mbps 1000Mbps LEDs LEDQSFP+ LEDs QSFP+ LED is described in Table Power FaultLink ACT LED LinkFAN1 FAN2AC OK Console Port AT-PWR06 Power Supply Module Stack Installation Guide for AT-2552XS L2 Data Center Switch AT-FAN06 Fan Module Beginning the Installation Installation Overview Step ProcedureReviewing Safety Precautions Beginning the Installation Stack Installation Guide for AT-2552XS L2 Data Center Switch Beginning the Installation Planning the Installation Unpacking the Switch AT-DC2552XS SwitchAT-PWR06 Power Supply AT-FAN06 Fan Module Installing the Switch and Modules Installing the Switch on a Desktop Installing the Switch in an Equipment Rack Possible Bracket LocationsInstalling the Switch and Modules Mounting the Switch in an Equipment Rack Installing and Replacing AT-PWR06 Power Supply Module Installing Power Supply ModuleInsert AT-PWR06 Module Into Chassis Replacing Power Supply Module Tighten AT-PWR06 Captive ScrewsInstalling Power Supply Blank Cover Installing and Replacing AT-FAN06 Fan Module Installing Fan ModuleStack Installation Guide for AT-2552XS L2 Data Center Switch Replacing Fan Module Installing the SFP+ and QSFP+ Transceivers and Cables Installing SFP+ Transceivers and Cables 10GBASE-SRAT-SP10SR 10GBASE-LRInstalling SFP+ Transceiver Removing SFP+ Dust Cover Installing a SFP+ Direct Attach Cables Installing the SFP+ and QSFP+ Transceivers and Cables AT-QSFPSR Installing QSFP+ Transceivers and Cables40GBASE-SR4 Installing the SFP+ and QSFP+ Transceivers and Cables QSFP+ Mthtp Installing the SFP+ and QSFP+ Transceivers and Cables Powering the Switch Powering On the Switch Stack Installation Guide for AT-2552XS L2 Data Center Switch Turn Off the switch Managing the Switch Connecting the Console Port Local ManagementStack Installation Guide for AT-2552XS L2 Data Center Switch NET Mgmt Cable Installation Remote Network ManagementStack Installation Guide for AT-2552XS L2 Data Center Switch Managing the Switch Troubleshooting Troubleshooting Stack Installation Guide for AT-2552XS L2 Data Center Switch Troubleshooting Technical Specifications Physical SpecificationsEnvironmental Specifications Appendix aPower Specifications CertificationsQuality and Reliability MtbfRJ-45 Twisted Pair Port Pinouts TX+ RX+Pinout Pair Stack Installation Guide for AT-2552XS L2 Data Center Switch Appendix a Technical Specifications