
Chapter 2: Beginning the Installation
Unpacking the Switch
AT-DC2552XS Switch
Refer to the following figures in this section to verify the contents of the shipping containers:
Note
If any item in a shipping container is missing or damaged, contact your Allied Telesis sales representative for assistance.
The contents of the
One
One 2 m (6.6 ft) local management cable with
USB and
Two rack mounting brackets with eight bracket screws
Desk top mounting feet
Figure 11. Contents of the AT-DC2552XS Shipping Box
Note
You should retain the original packaging material in the event you need to return the unit to Allied Telesis.
40