Allied Telesis AT-FAN06, AT-PWR06, AT-DC2552XS manual Link ACT LED

Page 26

Chapter 1: Overview

NET MGMT LED

The NET MGMT LED are shown in Figure 6.

LINK

ACT

LED

LED

 

Figure 6. NET MGMT LEDs

The NET MGMT LEDs are described in Table 5.

Table 5. NET MGMT LED Descriptions

 

Location

LED

State

Description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The NET MGMT port has established a link to

 

 

 

 

Solid green

a network device, but no packets are being

 

 

 

ACT

 

transmitted or received.

 

 

 

 

 

 

 

 

Flashing

The NET MGMT port is receiving or

 

 

 

(Right LED)

 

 

Rear

 

green

transmitting packets to a network device.

 

 

 

 

 

 

 

 

Off

The NET MGMT port established a link to a

 

 

Panel

 

 

 

 

 

network device.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Solid green

A valid 1G link is established on the port.

 

 

 

LINK

 

 

 

 

 

Solid yellow

A valid 10/100M link is established on the port.

 

 

 

(Left LED)

 

 

 

 

 

Off

No link is established on the port.

 

 

 

 

 

 

 

 

 

 

 

26

Image 26
Contents Installation Guide Page Electrical Safety and Emissions Standards TickTranslated Safety Statements Contents Page Figures Figures Tables Tables Preface Document Conventions Contacting Allied Telesis Preface Overview ChapterAT-DC2552XS Features FunctionsInstallation Options Optional QSFP+ Transceivers  AT-QSFPSR 40GBASE-SR4 MPOLED LED FANAT-DC2552XS Rear Panel Stack Installation Guide for AT-2552XS L2 Data Center Switch Cable Type 10Mbps 100Mbps 1000Mbps LEDs LEDQSFP+ LEDs QSFP+ LED is described in Table Power FaultLink ACT LED LinkFAN1 FAN2AC OK Console Port AT-PWR06 Power Supply Module Stack Installation Guide for AT-2552XS L2 Data Center Switch AT-FAN06 Fan Module Beginning the Installation Installation Overview Step ProcedureReviewing Safety Precautions Beginning the Installation Stack Installation Guide for AT-2552XS L2 Data Center Switch Beginning the Installation Planning the Installation Unpacking the Switch AT-DC2552XS SwitchAT-PWR06 Power Supply AT-FAN06 Fan Module Installing the Switch and Modules Installing the Switch on a Desktop Installing the Switch in an Equipment Rack Possible Bracket LocationsInstalling the Switch and Modules Mounting the Switch in an Equipment Rack Installing and Replacing AT-PWR06 Power Supply Module Installing Power Supply ModuleInsert AT-PWR06 Module Into Chassis Replacing Power Supply Module Tighten AT-PWR06 Captive ScrewsInstalling Power Supply Blank Cover Installing and Replacing AT-FAN06 Fan Module Installing Fan ModuleStack Installation Guide for AT-2552XS L2 Data Center Switch Replacing Fan Module Installing the SFP+ and QSFP+ Transceivers and Cables AT-SP10SR Installing SFP+ Transceivers and Cables10GBASE-SR 10GBASE-LRInstalling SFP+ Transceiver Removing SFP+ Dust Cover Installing a SFP+ Direct Attach Cables Installing the SFP+ and QSFP+ Transceivers and Cables AT-QSFPSR Installing QSFP+ Transceivers and Cables40GBASE-SR4 Installing the SFP+ and QSFP+ Transceivers and Cables QSFP+ Mthtp Installing the SFP+ and QSFP+ Transceivers and Cables Powering the Switch Powering On the Switch Stack Installation Guide for AT-2552XS L2 Data Center Switch Turn Off the switch Managing the Switch Connecting the Console Port Local ManagementStack Installation Guide for AT-2552XS L2 Data Center Switch NET Mgmt Cable Installation Remote Network ManagementStack Installation Guide for AT-2552XS L2 Data Center Switch Managing the Switch Troubleshooting Troubleshooting Stack Installation Guide for AT-2552XS L2 Data Center Switch Troubleshooting Environmental Specifications Technical SpecificationsPhysical Specifications Appendix aQuality and Reliability Power SpecificationsCertifications MtbfRJ-45 Twisted Pair Port Pinouts TX+ RX+Pinout Pair Stack Installation Guide for AT-2552XS L2 Data Center Switch Appendix a Technical Specifications