Allied Telesis AT-DC2552XS, AT-PWR06, AT-FAN06 manual Figures

Page 7

Figures

Figure 1: AT-DC2552XS Front Panel View

19

Figure 2: AT-DC2552XS Rear Panel

20

Figure 3: SFP+ Slot LEDs

23

Figure 4: QSFP+ LEDs

24

Figure 5: Power/Fault LEDs

25

Figure 6: NET MGMT LEDs

26

Figure 7: FAN Status LEDs

27

Figure 8: AC Power LED

28

Figure 9: AT-PWR06 Power Supply Module

30

Figure 10: AT-FAN06 Fan Module

32

Figure 11: Contents of the AT-DC2552XS Shipping Box

40

Figure 12: Contents of the AT-PWR06 Power Supply Module Shipping Box

41

Figure 13: Contents of the AT-FAN06 Fan Module Shipping Box

42

Figure 14: Attaching the Rubber Feet

44

Figure 15: Possible Bracket Locations

45

Figure 16: Attaching the Brackets to Switch

46

Figure 17: Mounting the Switch in an Equipment Rack

47

Figure 18: Loosen Power Supply Captive Screws

48

Figure 19: Insert AT-PWR06 Module Into Chassis

49

Figure 20: Tighten AT-PWR06 Captive Screws

50

Figure 21: Loosen Screws on Fan Blank Cover

52

Figure 22: Insert AT-FAN06 Module Into Chassis

52

Figure 23: Tighten AT-FAN06 Captive Screws

53

Figure 24: Removing the Dust Plug from a SFP+ Slot

57

Figure 25: Handle on SFP Transceiver

57

Figure 26: Installing a SFP+ Transceiver

58

Figure 27: Removing SFP+ Dust Cover

58

Figure 28: Attaching a Fiber Optic Cable to an SFP+ Transceiver

59

Figure 29: Removing the Dust Plug from a SFP+ Slot

59

Figure 30: Installing a SFP+ Direct Attach Cable

60

Figure 31: Removing QSFP+ Slot Dust Cover

62

Figure 32: Installing an QSFP+ Transceiver

62

Figure 33: Removing QSFP+ Dust Cover

63

Figure 34: Attaching a Fiber Optic Cable to an QSFP+ Transceiver

63

Figure 35: Removing QSFP+ Slot Dust Cover

64

Figure 36: Installing an QSFP+ MTHTP Cable

64

Figure 37: Connecting the Management Cable to the Console Port

70

Figure 38: Connecting the Twisted Pair Cable into the NET MGMT port

73

Figure 39: RJ-45 Connector and Port Pin Layout

81

7

Image 7
Contents Installation Guide Page Tick Electrical Safety and Emissions StandardsTranslated Safety Statements Contents Page Figures Figures Tables Tables Preface Document Conventions Contacting Allied Telesis Preface Chapter OverviewFunctions AT-DC2552XS FeaturesInstallation Options  AT-QSFPSR 40GBASE-SR4 MPO Optional QSFP+ TransceiversLED FAN LEDAT-DC2552XS Rear Panel Stack Installation Guide for AT-2552XS L2 Data Center Switch Cable Type 10Mbps 100Mbps 1000Mbps LED LEDsQSFP+ LEDs QSFP+ LED is described in Table Fault PowerLink Link ACT LEDFAN2 FAN1AC OK Console Port AT-PWR06 Power Supply Module Stack Installation Guide for AT-2552XS L2 Data Center Switch AT-FAN06 Fan Module Beginning the Installation Step Procedure Installation OverviewReviewing Safety Precautions Beginning the Installation Stack Installation Guide for AT-2552XS L2 Data Center Switch Beginning the Installation Planning the Installation AT-DC2552XS Switch Unpacking the SwitchAT-PWR06 Power Supply AT-FAN06 Fan Module Installing the Switch and Modules Installing the Switch on a Desktop Possible Bracket Locations Installing the Switch in an Equipment RackInstalling the Switch and Modules Mounting the Switch in an Equipment Rack Installing Power Supply Module Installing and Replacing AT-PWR06 Power Supply ModuleInsert AT-PWR06 Module Into Chassis Tighten AT-PWR06 Captive Screws Replacing Power Supply ModuleInstalling Power Supply Blank Cover Installing Fan Module Installing and Replacing AT-FAN06 Fan ModuleStack Installation Guide for AT-2552XS L2 Data Center Switch Replacing Fan Module Installing the SFP+ and QSFP+ Transceivers and Cables 10GBASE-LR Installing SFP+ Transceivers and Cables10GBASE-SR AT-SP10SRInstalling SFP+ Transceiver Removing SFP+ Dust Cover Installing a SFP+ Direct Attach Cables Installing the SFP+ and QSFP+ Transceivers and Cables 40GBASE-SR4 Installing QSFP+ Transceivers and CablesAT-QSFPSR Installing the SFP+ and QSFP+ Transceivers and Cables QSFP+ Mthtp Installing the SFP+ and QSFP+ Transceivers and Cables Powering the Switch Powering On the Switch Stack Installation Guide for AT-2552XS L2 Data Center Switch Turn Off the switch Managing the Switch Local Management Connecting the Console PortStack Installation Guide for AT-2552XS L2 Data Center Switch Remote Network Management NET Mgmt Cable InstallationStack Installation Guide for AT-2552XS L2 Data Center Switch Managing the Switch Troubleshooting Troubleshooting Stack Installation Guide for AT-2552XS L2 Data Center Switch Troubleshooting Appendix a Technical SpecificationsPhysical Specifications Environmental SpecificationsMtbf Power SpecificationsCertifications Quality and ReliabilityTX+ RX+ RJ-45 Twisted Pair Port PinoutsPinout Pair Stack Installation Guide for AT-2552XS L2 Data Center Switch Appendix a Technical Specifications