3.3.2Unit Handling

If possible, transport the unit using a forklift or pallet jack.

If using a forklift or pallet jack, ensure that the fork tine length is suitable to safely move the packaged unit.

Liebert Corporation recommends that the unit remain in the protective packaging until located at the installation site.

When handling and unpacking the unit, exercise great care to prevent damage.

Do not use unit piping to lift or move the Liebert XDV

3.3.3Unpacking the Unit Domestic Packaging

1.Remove outer packaging when ready to install the Liebert XDV.

2.Keep the Liebert XDV covered by the unit bag until removal from pallet.

Figure 5 Removing domestic shipping package

Plastic bag used for shipping not shown for clarity.

Step 1

Step 2

Step 3

Do not use unit piping to lift or move the Liebert XDV

Step 4

Step 5

5

Image 11
Contents Liebert XDV Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Electrical Installation Checklist and System Fill for StartupMaintenance SpecificationsFigures Page Liebert XDV component locations Example XDV10BKReferences Pre-Installation ChecksInstallation Considerations InstallationGeneral Product Information Product/System DescriptionChecking and Unpacking Recyclable Packaging Equipment InspectionUnpacking the Unit Domestic Packaging Unit HandlingRemoving export shipping package Export PackagingRemoving Liebert XDV from shipping pallet Removing the Liebert XDV from the PalletMechanical Considerations Determining Placement in the Conditioned SpaceDimensional data Changing the Liebert XDV’s air intake location Changing the Air Intake LocationBolting Liebert XDV to Top of Cabinet Mounting the Liebert XDV on Top of the CabinetMounting the Liebert XDV Bottom View Mounting clip placement Using Supplied Clips for MountingPg , Rev Suspension hardware and bracket dimensional dataSuspended Mounting Method 11mm 22mm Top View 2 64mm 76mm 102mm DPN000770Suspending the Liebert XDV from Overhead Structures Suspending the Liebert XDV from UnistrutsSuspending Liebert XDV from the overhead structure Stacking configuration offset Mounting Liebert XDVs in Stacked SetupStacked Liebert XDVs suspended from Unistruts Hanging Stacked Liebert XDVs from UnistrutsHanging Stacked Liebert XDVs from the Overhead Structure Piping System Connection ConfigurationEuropean Union Fluorinated Greenhouse Gas Requirements Piping Connections to Liebert XDP or Liebert XDC Connection Methods and PointsRight Side Liebert XDV Holding Charge-Hard-Piped Units Hard Piped Connection SizesBrazing Preparations-Hard-Piped Units Recommended Piping SizeBranch piping sizes for refrigerant loop Connection Methods-One-Shot ConnectionsRefrigerant Charge-Pre-Charged Option Field Installation of Liebert Flex Pipe Kit on Liebert XDVConnecting Liebert XD Flex Pipe to Liebert XDV Modules Tools Required Liebert XD prefabricated piping assemblyOvertighten With wrenchReturn Piping mains without Liebert XDV and Liebert Flex Pipe InsulationRear of Liebert XDV Connecting High Voltage Cables for CSA/C-US Certified UnitsElectrical Rear Liebert XDVLiebert XDV electrical connections for CE-approved units Rear View of Liebert Xdvto be N.E.C. Class Connecting Low Voltage Wiring-OptionalCondensate Detection Connections Installation Checklist and System Fill for Startup Checklist for Proper InstallationOperation Start the Liebert XDVFluorinated Greenhouse Gas Requirements Internal AccessMaintenance Accessing internal electrical components Accessing Internal Electrical ComponentsTo remove the fan tray Liebert XDV10 specifications SpecificationsLiebert XDV8 specifications Liebert XD Liebert Flex Pipe assemblies, supply and return Page That Ne tIti Ti n