Liebert manual Suspending Liebert XDV from the overhead structure

Page 21

Mounting the Liebert XDV

Figure 16 Suspending Liebert XDV from the overhead structure

3/8"-16 all-thread bolts, field-supplied, typical

Hanging Liebert XDV unit

To prevent bypass air from recirculating through the Liebert XDV without it passing through the cabinet, this space between the hanging XDV and the cabinet must be blocked.

15

Image 21
Contents Liebert XDV Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Maintenance Installation Checklist and System Fill for StartupSpecifications ElectricalFigures Page Liebert XDV component locations Example XDV10BKInstallation Considerations Pre-Installation ChecksInstallation ReferencesProduct/System Description Checking and UnpackingGeneral Product Information Recyclable Packaging Equipment InspectionUnpacking the Unit Domestic Packaging Unit HandlingRemoving export shipping package Export PackagingRemoving Liebert XDV from shipping pallet Removing the Liebert XDV from the PalletDetermining Placement in the Conditioned Space Dimensional dataMechanical Considerations Changing the Liebert XDV’s air intake location Changing the Air Intake LocationMounting the Liebert XDV on Top of the Cabinet Mounting the Liebert XDVBolting Liebert XDV to Top of Cabinet Bottom View Mounting clip placement Using Supplied Clips for MountingSuspended Mounting Method Suspension hardware and bracket dimensional data11mm 22mm Top View 2 64mm 76mm 102mm DPN000770 Pg , RevSuspending the Liebert XDV from Overhead Structures Suspending the Liebert XDV from UnistrutsSuspending Liebert XDV from the overhead structure Stacking configuration offset Mounting Liebert XDVs in Stacked SetupStacked Liebert XDVs suspended from Unistruts Hanging Stacked Liebert XDVs from UnistrutsHanging Stacked Liebert XDVs from the Overhead Structure System Connection Configuration European Union Fluorinated Greenhouse Gas RequirementsPiping Piping Connections to Liebert XDP or Liebert XDC Connection Methods and PointsRight Side Liebert XDV Holding Charge-Hard-Piped Units Hard Piped Connection SizesBrazing Preparations-Hard-Piped Units Recommended Piping SizeBranch piping sizes for refrigerant loop Connection Methods-One-Shot ConnectionsField Installation of Liebert Flex Pipe Kit on Liebert XDV Connecting Liebert XD Flex Pipe to Liebert XDV ModulesRefrigerant Charge-Pre-Charged Option Tools Required Liebert XD prefabricated piping assemblyOvertighten With wrenchReturn Piping mains without Liebert XDV and Liebert Flex Pipe InsulationElectrical Connecting High Voltage Cables for CSA/C-US Certified UnitsRear Liebert XDV Rear of Liebert XDVLiebert XDV electrical connections for CE-approved units Connecting Low Voltage Wiring-Optional Condensate Detection ConnectionsRear View of Liebert Xdvto be N.E.C. Class Installation Checklist and System Fill for Startup Checklist for Proper InstallationOperation Start the Liebert XDVInternal Access MaintenanceFluorinated Greenhouse Gas Requirements Accessing internal electrical components Accessing Internal Electrical ComponentsTo remove the fan tray Liebert XDV10 specifications SpecificationsLiebert XDV8 specifications Liebert XD Liebert Flex Pipe assemblies, supply and return Page Iti Ne tTi n That