Liebert XDV manual Liebert XD Liebert Flex Pipe assemblies, supply and return

Page 46

Specifications

Table 7

Liebert XD Liebert Flex Pipe assemblies, supply and return

 

 

 

 

 

 

 

 

 

 

 

 

Liebert P/N

Liebert P/N

 

 

Minimum Bend Radius

 

 

 

 

inches (mm)

 

 

Straight Connection

90-Degree Connection

Length

 

Description

Assembly

Assembly

ft (m)

 

Supply

Return

 

 

 

 

 

 

 

 

 

 

186568G1

186567G1

6 (1.8)

 

 

 

 

 

 

 

 

 

 

Liebert XD Flex

186568G2

186567G2

10 (3.0)

 

7 (178)

8 (203)

Pipe Kit

186568G3

186567G3

8 (2.5)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

186568G4

186567G4

4 (1.2)

 

 

 

 

 

 

 

 

 

 

 

40

Image 46
Contents Liebert XDV General Safety Guidelines Fluorinated Greenhouse Gas Requirements-European UnionTable of Contents Specifications Installation Checklist and System Fill for StartupMaintenance ElectricalFigures Page Example XDV10BK Liebert XDV component locationsInstallation Pre-Installation ChecksInstallation Considerations ReferencesChecking and Unpacking Product/System DescriptionGeneral Product Information Equipment Inspection Recyclable PackagingUnit Handling Unpacking the Unit Domestic PackagingExport Packaging Removing export shipping packageRemoving the Liebert XDV from the Pallet Removing Liebert XDV from shipping palletDimensional data Determining Placement in the Conditioned SpaceMechanical Considerations Changing the Air Intake Location Changing the Liebert XDV’s air intake locationMounting the Liebert XDV Mounting the Liebert XDV on Top of the CabinetBolting Liebert XDV to Top of Cabinet Bottom View Using Supplied Clips for Mounting Mounting clip placement11mm 22mm Top View 2 64mm 76mm 102mm DPN000770 Suspension hardware and bracket dimensional dataSuspended Mounting Method Pg , RevSuspending the Liebert XDV from Unistruts Suspending the Liebert XDV from Overhead StructuresSuspending Liebert XDV from the overhead structure Mounting Liebert XDVs in Stacked Setup Stacking configuration offsetHanging Stacked Liebert XDVs from Unistruts Stacked Liebert XDVs suspended from UnistrutsHanging Stacked Liebert XDVs from the Overhead Structure European Union Fluorinated Greenhouse Gas Requirements System Connection ConfigurationPiping Connection Methods and Points Piping Connections to Liebert XDP or Liebert XDCRight Side Liebert XDV Hard Piped Connection Sizes Holding Charge-Hard-Piped UnitsRecommended Piping Size Brazing Preparations-Hard-Piped UnitsConnection Methods-One-Shot Connections Branch piping sizes for refrigerant loopConnecting Liebert XD Flex Pipe to Liebert XDV Modules Field Installation of Liebert Flex Pipe Kit on Liebert XDVRefrigerant Charge-Pre-Charged Option Liebert XD prefabricated piping assembly Tools RequiredWith wrench OvertightenReturn Insulation Piping mains without Liebert XDV and Liebert Flex PipeRear Liebert XDV Connecting High Voltage Cables for CSA/C-US Certified UnitsElectrical Rear of Liebert XDVLiebert XDV electrical connections for CE-approved units Condensate Detection Connections Connecting Low Voltage Wiring-OptionalRear View of Liebert Xdvto be N.E.C. Class Checklist for Proper Installation Installation Checklist and System Fill for StartupStart the Liebert XDV OperationMaintenance Internal AccessFluorinated Greenhouse Gas Requirements Accessing Internal Electrical Components Accessing internal electrical componentsTo remove the fan tray Specifications Liebert XDV10 specificationsLiebert XDV8 specifications Liebert XD Liebert Flex Pipe assemblies, supply and return Page Ti n Ne tIti That