Maintenance

10.0MAINTENANCE

Minimal maintenance is required to keep the Liebert XDV operating at optimal levels. The unit should be cleaned and checked for damage and worn parts. Suggested maintenance includes:

Cooling fins—Clean any dust and debris from the cooling fins, taking care not to bend them

Circulating fans—Clean any dust from the fans.

10.1Fluorinated Greenhouse Gas Requirements

Stationary air conditioning, refrigeration, heat pump equipments and stationary fire protection sys- tems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmo- sphere.

The F-Gas Regulation requires operators to use use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas during equipment service and maintenance and before disposing of equipment.

Refer to the full regulation for additional details.

10.2 Internal Access

! WARNING

Risk of high-speed moving parts. Can cause death, injury and equipment damage.

Before opening the Liebert XDV, shut the unit off and disconnect all electrical power. Wait for the Liebert XDV’s fans to stop rotating before beginning to open the unit.

! WARNING

Risk of electrical shock. May cause death or injury. Disconnect all power before working within.

• Turn off the main switch (in the center of the fan tray).

• Remove both power cords from the electrical supply outlets or from the receptacles on the back of the Liebert XDV.

! CAUTION

Risk of improper handling. May cause injury.

Use both hands when removing fan tray assembly. Improperly handling the assembly may cause injury during removal.

The conditions required for sensitive electronic equipment should preclude the accumulation of appre- ciable amounts of dust in the Liebert XDV. Most of that small amount should be found on the rear coils, near the air inlet. The rear covers and the fan tray on the front of the Liebert XDV are easily removed for maintenance. (A wiring diagram is provided on the inside of the fan tray.)

To remove the rear grille:

1.Loosen the six screws holding the grille on the rear of the Liebert XDV.

2.Remove the grille and lay it aside for reinstallation.

35

Image 41
Contents Liebert XDV Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesTable of Contents Maintenance Installation Checklist and System Fill for StartupSpecifications ElectricalFigures Page Liebert XDV component locations Example XDV10BKInstallation Considerations Pre-Installation ChecksInstallation ReferencesGeneral Product Information Product/System DescriptionChecking and Unpacking Recyclable Packaging Equipment InspectionUnpacking the Unit Domestic Packaging Unit HandlingRemoving export shipping package Export PackagingRemoving Liebert XDV from shipping pallet Removing the Liebert XDV from the PalletMechanical Considerations Determining Placement in the Conditioned SpaceDimensional data Changing the Liebert XDV’s air intake location Changing the Air Intake LocationBolting Liebert XDV to Top of Cabinet Mounting the Liebert XDV on Top of the CabinetMounting the Liebert XDV Bottom View Mounting clip placement Using Supplied Clips for MountingSuspended Mounting Method Suspension hardware and bracket dimensional data11mm 22mm Top View 2 64mm 76mm 102mm DPN000770 Pg , RevSuspending the Liebert XDV from Overhead Structures Suspending the Liebert XDV from UnistrutsSuspending Liebert XDV from the overhead structure Stacking configuration offset Mounting Liebert XDVs in Stacked SetupStacked Liebert XDVs suspended from Unistruts Hanging Stacked Liebert XDVs from UnistrutsHanging Stacked Liebert XDVs from the Overhead Structure Piping System Connection ConfigurationEuropean Union Fluorinated Greenhouse Gas Requirements Piping Connections to Liebert XDP or Liebert XDC Connection Methods and PointsRight Side Liebert XDV Holding Charge-Hard-Piped Units Hard Piped Connection SizesBrazing Preparations-Hard-Piped Units Recommended Piping SizeBranch piping sizes for refrigerant loop Connection Methods-One-Shot ConnectionsRefrigerant Charge-Pre-Charged Option Field Installation of Liebert Flex Pipe Kit on Liebert XDVConnecting Liebert XD Flex Pipe to Liebert XDV Modules Tools Required Liebert XD prefabricated piping assemblyOvertighten With wrenchReturn Piping mains without Liebert XDV and Liebert Flex Pipe InsulationElectrical Connecting High Voltage Cables for CSA/C-US Certified UnitsRear Liebert XDV Rear of Liebert XDVLiebert XDV electrical connections for CE-approved units Rear View of Liebert Xdvto be N.E.C. Class Connecting Low Voltage Wiring-OptionalCondensate Detection Connections Installation Checklist and System Fill for Startup Checklist for Proper InstallationOperation Start the Liebert XDVFluorinated Greenhouse Gas Requirements Internal AccessMaintenance Accessing internal electrical components Accessing Internal Electrical ComponentsTo remove the fan tray Liebert XDV10 specifications SpecificationsLiebert XDV8 specifications Liebert XD Liebert Flex Pipe assemblies, supply and return Page Iti Ne tTi n That