Maintenance

8.3Water/Glycol Floor Stand Condenser

8.3.1Shell and Tube Condensers

Each water or glycol cooled module has a shell and tube condenser which consists of a shell, remov- able heads, gaskets and cleanable copper tubes.

It may be necessary to clean the copper tubing periodically to remove any scale or lime that should collect (periods between cleanings will vary with local water conditions). As deposits build up, a clean- ing tool, available at any refrigeration supply house, should be used to clean the heat exchanger tubes.

1.Stop the unit (using the start/stop switch) and allow the compressor to pump down.

2.Open the disconnect switch.

3.Shut off the water supply valve to the condenser.

4.Drain the water from condensers and piping.

5.Remove the bolts securing each head and slowly pry them free.

6.Remove old gaskets and inspect sealing surfaces for pits and corrosion.

7.Swab the condenser tubes with a tube-cleaning tool.

8.When the tubes are clean, reinstall the heads using new factory gaskets.

9.Consult factory for specific torque requirements.

10.Reconnect the piping, open the water supply valve, vent the system and check for leaks.

8.3.2Regulating Valves

The water regulating valves automatically regulate the amount of fluid necessary to remove the heat from the refrigeration system, permitting more water to flow when load conditions are high and less fluid to flow when load conditions are low. The valve consists of a brass body, balance spring, valve seat, valve disc holders, capillary tube to discharge pressure and an adjusting screw.

Testing the Water Regulating Valve Function

1.Turn the refrigeration system Off.

2.Wait 10 to 15 minutes—water should stop flowing.

If the water continues to flow, the valve is either improperly adjusted (with head pressure too low) or the pressure sensing capillary is not connected properly to the condenser. Consult Table 24 - Liebert XDC troubleshooting.

8.3.3Glycol Solution Maintenance

Proper rust inhibitor maintenance is necessary to prevent corrosion of the glycol system. Consult the glycol manufacturer for testing and maintenance of inhibitors. Do not mix products from different manufacturers.

Inhibitor maintenance requirements depend on local water conditions. Analyzing water samples before installation and every six months will assist in developing a schedule. Inspect the solution and filter residue to determine whether corrosion is occurring.

A water treatment specialist may be required to set up a treatment program to remedy some water- caused problems.

53

Image 59
Contents Liebert XDC Example XDC160AA General Safety GuidelinesVoltage-phase-frequency Density system = 380/415-3ph-50Hz Table of Contents Specifications Alarm Descriptions and SolutionsFigures Tables Product Description General Product InformationEquipment Inspection Equipment HandlingRemoval of Skid Handling With SkidRemove tie-down brackets Positioning the Liebert XDC Liebert XDC dimensions, weightMechanical Considerations Removing Piano JacksLiebert XDC piping connection sizes Piping locationsPlacing the Liebert XDC on a Floor Stand Liebert XDC water/glycol piping connection Sizes Detail aTOP View of Floor Stand Positioning the Liebert XDC with Floor Stand Dimensions and clearances for Liebert XDC on floor standHigh Voltage Connections Connecting High-Voltage CablesElectrical enclosure knockout locations for field wiring Contactors Liebert XDC heat rejection connection points Extra Low Voltage ConnectionsField Connections-Air Cooled Units only Field Connections-All UnitsField Connections-Optional for All Units Extra Low Voltage field connections points Supply, return pipe sizes for Liebert XD refrigerant loop European Union Fluorinated Greenhouse Gas RequirementsRecommended Pipe Size Liebert XDC Interconnection With Liebert XD Cooling ModulePiping Mains Piping Installation MethodPiping Installation-R-134a Pumped Circuit Required Number Bypass Flow ControllersBypass flow controllers for a Liebert XDC-based system Liebert XDP Liebert XDC Evacuation and Leak Check-R-134a Pumped CircuitInsulation System refrigerant charge for the supply and return mains Filling the Pumped Circuit-R-134aWorksheet to calculate refrigerant charge Calculating Refrigerant Charge-ExampleCalculating refrigerant charge-example Double discharge riser layout Install Double Discharge RisersPage Installation data-Lee-Temp, one-circuit, four-fan model See for details on piping connections Piping Schematic Recommended refrigerant line sizes, DX R-407c, OD copper General arrangement air cooled Liebert XDC Lee-Temp ControlRecommended refrigerant line sizes for DCSL616 For mounting instructions, refer to Figure Lee-Temp Control Materials Supplied Lee-Temp PipingIndoor water/glycol cooled module R-407C refrigerant charge Filling the Direct Expansion DX Circuit-R-407cIndoor unit refrigerant charge-R-407c Outdoor air condenser charge-R-407cInstallation Checklist Indicator Lights Description Green Red Checklist for Liebert XDC StartupLiebert XDC pump light indicator Compressor Type 407c Compressor oil typesRefrigerant Type Liebert XDC system is now ready to be turned on User interface keypad functions Feature OverviewMicroprocessor Control DisplayMain Menu Feature OverviewViewing or Changing Settings ControlsHI AIR Temp Setpoint functions, default values and allowable rangesSetpoints MIN Temp SPTime Active AlarmsAlarm History StatusPump Start TD Setup OperationRestart DegreesDipswch Pump OFF TDLead Pump Lead TandemSetup Password Setpt PasswordCalibrate Sensors Alarm EnableCustom Alarms Alarm Time DelayCOM Alarm Enable Custom Text DiagnosticsAlarm Descriptions and Solutions Alarm DescriptionsRed and Green Lamp Indicators View Active Alarms Enable / Disable AlarmsAlarm Time Delays System Shutdown Causes View Alarm HistoryLiebert XDC troubleshooting TroubleshootingToo warm Air Cooled Condenser MaintenanceFluorinated Greenhouse Gas Requirements Shell and Tube Condensers Testing the Water Regulating Valve FunctionGlycol Solution Maintenance Water/Glycol Floor Stand CondenserLiebert XDC specifications SpecificationsPerformance Data Performance DataHeat Rejection Equipment Piping Connections204 Page That Ne tIti Ti n