Installation and Configuration
5.0INSTALLATION AND CONFIGURATION
Do NOT attempt to start the UPS, turn on any circuit breaker or energize the input power until instructed to do so in 6.0 - Initial
Visually inspect the UPS for freight damage. Report any damage to the carrier and your local dealer or Liebert representative.
! CAUTION
The UPS is heavy (see 13.0 - Specifications). Take proper precautions when lifting or moving it.
Install the UPS indoors in a controlled environment, where it cannot be accidentally turned off. Place it where air flows unrestricted around the unit. The installation location must be free of water, flam- mable liquids, gases, corrosives and conductive contaminants. Maintain a minimum clearance of
4 inches (100mm) in the front and rear of the UPS. Maintain an ambient temperature range of
NOTE
UPS operation in sustained temperatures above 77°F (25°C) reduces battery life.
5.1Install the Main Cabinet
The
5.1.1Tower UPS Installation
When using the
Attach Bezels to Top
When used as a tower, the
1.Position the UPS so that the battery compartments are on the right side.
2.Attach the top bezels by placing them on the mounting holes and sliding them toward the rear of the UPS.
Figure 5 Tower-use support bases, spacers for external battery cabinets
3U
3U
2U
2U
5U support base for GXT2 | Spacers added to support base |
End bases and 3U spacer | to accommodate additional battery cabinets |
11