Chapter 2 SRG50 overview 25
The figure Process map for installing and configuring an SRG on page 26 provides a process map for installing and configuring an SRG50. The procedures in this document assume that the following activities have been completed:
•The BCM50, including media bay modules, cabling, telephones, and peripherals, have been installed.
•BCM50 administration has been set up.
•The basic parameters of the BCM50 have been configured.
•CS1000 main office system has been installed and configured to support SRG.
•The SRG has been connected to the LAN (as required) and WAN (to the main office).
•System functionality has been tested to this point.
•Attached devices have been installed and configured (for information about configuring IP Phones, see IP telephones setup and configuration on page 53).
•