American Power Conversion MX28B4800 AC Power Connections, Fuse Alarm Ribbon Cable Connections

Page 14

Fuse Alarm Ribbon Cable Connections

There is a 16-conductor ribbon cable, if any bay has fuses installed. This cable ties together the Wago breakout board in each bay with fuses. The ribbon cable must connect all the Wago breakout boards together with one ribbon cable. The idea is that each fuse will have one wire in the ribbon cable for the alarm. Two fuse alarm wires should not be connected to the same fuse. See Figure 3.2-6for details. Ribbon cable pin 1 is for Fuse 1. Ribbon cable pin 2 is for Fuse 2 etc.

Figure 3.2-6 Wago Fuse Alarm Breakout Board

Ventilation

The rectifier modules for this system have fans that provide front-to-rear airflow for internal cooling. The MX28B housing should mounted such that there is free airflow to the front and top of the unit. [Refer to Section 8.5 for environmental characteristics.] Free airflow should be ensured so that the power system can provide full power without de-rating.

3.3. AC Power Connections

WARNING: Ensure that all of the external DC and AC circuit breakers are in the OFF position prior to connecting service to the power plant. Confirm that all voltages have been removed including any battery sources before proceeding.

The MX28B DC power plant requires the supply of 208/220/240/277 VAC single-phase, 50/60 Hz power through individual external 20-amp circuit breakers to the AC input terminal block connections for each rectifier module in the system. Two rectifier modules are required to accommodate the full AC input voltage range. The 1MRF28H54BV rectifier is designed for the standard 208/220/240 VAC input service, while the 1MRF28H54BV50 is used for the 277 VAC

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual

Page 9

Image 14
Contents VDC Power Systems Table of Contents Commissioning and Preventive Maintenance APC Worldwide Customer Support Limited Product Warranty Revision History Revision Date DescriptionSafety First General PrecautionsGeneral Information How to Use This ManualIntroduction 1 MX28B-1200 -48 VDC Power Plant Rectifier Bay 2 MX28B Block Diagram Unpacking Equipment InstallationMechanical Installation Room / LocationPower Bus Connections Mounting2 MX28B-1200-2400 has a maximum Circuit Breaker/LVD Ribbon Cable Connections 5 Circuit Breaker / LVD Expansion BoardVentilation AC Power ConnectionsFuse Alarm Ribbon Cable Connections 1 AC Input Wiring Battery Connections Planning the Battery InstallationConnecting the Battery Cables 1 Battery Cable Connection Locations2 Battery Probe Connection DC System GroundingDC Power Output Over-Current Protection DC Plug-in Circuit BreakersBreaker Part Number Rating 2 Plug-in Circuit Breakers DC Bolt-in Circuit Breakers 4 Bolt-in Circuit BreakersTelecom Fuses 5 Telecom FusesInstallation of Circuit Breakers and Fuses Plug-in Circuit Breaker InstallationBolt-in Circuit Breaker Installation 2 Circuit Breaker Alarm WiringTelecom Fuse Installation GMT Fuse InstallationCircuit Breaker Connections 1 to 50 Amps Load ConnectionsCable Size Considerations Circuit Breaker Connections 60-100 AmpsFront Panel DB9 Connection Monitoring and Relay Output ConnectionsGMT Fuse Connections Smart Cable DB9 ConnectionRJ45 Ethernet Connector Relay Output ConnectionsExternal Alarm Input Connections NO-NC-CRectifier Module Installation Battery Visual and Safety Inspection Commissioning and Preventive MaintenanceElectrical Installation Pre-Commissioning InspectionInitial Set-up AC Power UpCommissioning Rectifier Test DC Power UpBattery Power Up LVD TestUser Inputs Battery Temperature CompensationCircuit Breaker/ Fuse Test Output RelaysFinal Inspection Rectifier Management OperationTechnical Description System Voltage Control System ManagementSystem Output Capacity System CurrentBattery Charging and Protection Battery ManagementSystem Status and Alarm Reporting DC DistributionFront Panel User Interface Controls and IndicatorsBattery/Load Low Voltage Disconnect Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default ValuesAddress Alarm ItemNo Alarms Switzer70.0 C Batt HT AlmBatt HT Thr Batt HV AlmCir Bkr 72 Almm+ Cir Bkr 1 Alm m+Major Comp HkneeHw Batt C Almm+ Fuse 1 AlmFuse 16 Alm Minor48.00 LVD ResetLVD Option LVD TripOut-Rly 6 Dly m+ Out-Rly 1 Dly m+Sec Relay MajorMRF28H54 DisableRect 1 Desc Rect 1ofN Almm+Sys LT Alm Sys HV AlmSys HV Thr Sys LT ThrTime 90025SYS MS System Module SET-ALM Setup DA Control Unit Menu StructureV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin Modrec AM Info Modfuse LM Alias Fuse MOD Modlvd Modlvd LM Param Section Alarm Outputs Output RelaysFront Panel LED Indicators External Alarm Inputs Input Relays Description Command and Monitoring ProtocolRemote Monitoring Physical ConnectionsEquipment Preventive MaintenanceSystem Visual and Safety Inspection InspectionRectifier Current Test TestSystem Voltage Test Battery Current Test Rectifier Alarm TestSystem Temperature Test Rectifier Current Share TestBattery Temperature Test Battery Preventive Maintenance ProcedureFinal Inspection 1MRF28H54BV Rectifiers SpecificationsAC Input 1MRF28H54BV50 RectifiersVDC RectifiersPower Shelf Control Unit Compliance MechanicalEnvironmental Toll Free APC Worldwide Customer SupportUS and Canada WorldwideLimited Product Warranty