American Power Conversion MX28B4800, MX28B2400 1 MX28B-1200 -48 VDC Power Plant Rectifier Bay

Page 8

Figure 2.2-1 MX28B-1200 –48 VDC Power Plant Rectifier Bay

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual

Page 3

Image 8
Contents VDC Power Systems Table of Contents Commissioning and Preventive Maintenance APC Worldwide Customer Support Limited Product Warranty Revision History Revision Date DescriptionSafety First General PrecautionsGeneral Information How to Use This ManualIntroduction 1 MX28B-1200 -48 VDC Power Plant Rectifier Bay 2 MX28B Block Diagram Installation Mechanical InstallationUnpacking Equipment Room / LocationPower Bus Connections Mounting2 MX28B-1200-2400 has a maximum Circuit Breaker/LVD Ribbon Cable Connections 5 Circuit Breaker / LVD Expansion BoardVentilation AC Power ConnectionsFuse Alarm Ribbon Cable Connections 1 AC Input Wiring Battery Connections Planning the Battery InstallationConnecting the Battery Cables 1 Battery Cable Connection Locations2 Battery Probe Connection DC System GroundingDC Power Output Over-Current Protection DC Plug-in Circuit BreakersBreaker Part Number Rating 2 Plug-in Circuit Breakers DC Bolt-in Circuit Breakers 4 Bolt-in Circuit BreakersTelecom Fuses 5 Telecom FusesInstallation of Circuit Breakers and Fuses Plug-in Circuit Breaker InstallationBolt-in Circuit Breaker Installation 2 Circuit Breaker Alarm WiringTelecom Fuse Installation GMT Fuse InstallationLoad Connections Cable Size ConsiderationsCircuit Breaker Connections 1 to 50 Amps Circuit Breaker Connections 60-100 AmpsMonitoring and Relay Output Connections GMT Fuse ConnectionsFront Panel DB9 Connection Smart Cable DB9 ConnectionRJ45 Ethernet Connector Relay Output ConnectionsExternal Alarm Input Connections NO-NC-CRectifier Module Installation Commissioning and Preventive Maintenance Electrical InstallationBattery Visual and Safety Inspection Pre-Commissioning InspectionInitial Set-up AC Power UpCommissioning DC Power Up Battery Power UpRectifier Test LVD TestBattery Temperature Compensation Circuit Breaker/ Fuse TestUser Inputs Output RelaysFinal Inspection Rectifier Management OperationTechnical Description System Management System Output CapacitySystem Voltage Control System CurrentBattery Management System Status and Alarm ReportingBattery Charging and Protection DC DistributionFront Panel User Interface Controls and IndicatorsBattery/Load Low Voltage Disconnect Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default ValuesAlarm Item No AlarmsAddress SwitzerBatt HT Alm Batt HT Thr70.0 C Batt HV AlmCir Bkr 1 Alm m+ MajorCir Bkr 72 Almm+ Comp HkneeFuse 1 Alm Fuse 16 AlmHw Batt C Almm+ MinorLVD Reset LVD Option48.00 LVD TripOut-Rly 1 Dly m+ SecOut-Rly 6 Dly m+ Relay MajorDisable Rect 1 DescMRF28H54 Rect 1ofN Almm+Sys HV Alm Sys HV ThrSys LT Alm Sys LT ThrTime 90025SYS MS System Module SET-ALM Setup DA Control Unit Menu StructureV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin Modrec AM Info Modfuse LM Alias Fuse MOD Modlvd Modlvd LM Param Section Alarm Outputs Output RelaysFront Panel LED Indicators External Alarm Inputs Input Relays Command and Monitoring Protocol Remote MonitoringDescription Physical ConnectionsPreventive Maintenance System Visual and Safety InspectionEquipment InspectionRectifier Current Test TestSystem Voltage Test Rectifier Alarm Test System Temperature TestBattery Current Test Rectifier Current Share TestBattery Temperature Test Battery Preventive Maintenance ProcedureFinal Inspection Specifications AC Input1MRF28H54BV Rectifiers 1MRF28H54BV50 RectifiersVDC RectifiersPower Shelf Control Unit Compliance MechanicalEnvironmental APC Worldwide Customer Support US and CanadaToll Free WorldwideLimited Product Warranty