Battery Temperature Probe Installation

The optional temperature probe is used to monitor the battery string temperature. To get the most representative temperature measurement, the probe should be placed in contact with a battery cell that is centrally located. The probe should be placed directly in contact with the cell (not the frame surrounding the cell). Generally, the cell cover can be used; be careful not to allow the probe body to touch the terminals. Remove the adhesive protection strip from the probe body and press the adhesive side of the probe on the battery cell cover. See Figure 3.4-3 for details. Plug the connector end of the temperature probe into J5 of the control unit backplane card. Route the cable as required positioning the probe on the selected battery cell. See Figure 3.4-2 for Details.

Figure 3.4-2 Battery Probe Connection

Figure 3.4-3 Battery Probe Installation

3.5. DC System Grounding

The Positive Battery connection (return bus) for the power plant must be connected to the Master Station Ground. The return bus provides 3/8” holes on 1 inch or 1-3/4 inch centers for connection of a two-hole lugged cable to the Central Office Ground. Details for this connection should be provided in the site electrical grounding plans.

A connection to tie the frames together is also available. frame is a pair of studs for connecting a grounding cable. each expansion frame.

At the top of both sides of the box This #6 AWG cable is provided with

MX28B1200/2400 MX28B1200/4800 –48 VDC User’s Manual

Page 13

Image 18
Contents VDC Power Systems Table of Contents Commissioning and Preventive Maintenance APC Worldwide Customer Support Limited Product Warranty Revision History Revision Date DescriptionSafety First General PrecautionsHow to Use This Manual IntroductionGeneral Information 1 MX28B-1200 -48 VDC Power Plant Rectifier Bay 2 MX28B Block Diagram Unpacking Equipment InstallationMechanical Installation Room / LocationPower Bus Connections Mounting2 MX28B-1200-2400 has a maximum Circuit Breaker/LVD Ribbon Cable Connections 5 Circuit Breaker / LVD Expansion BoardAC Power Connections Fuse Alarm Ribbon Cable ConnectionsVentilation 1 AC Input Wiring Battery Connections Planning the Battery InstallationConnecting the Battery Cables 1 Battery Cable Connection Locations2 Battery Probe Connection DC System GroundingDC Power Output Over-Current Protection DC Plug-in Circuit BreakersBreaker Part Number Rating 2 Plug-in Circuit Breakers DC Bolt-in Circuit Breakers 4 Bolt-in Circuit BreakersTelecom Fuses 5 Telecom FusesInstallation of Circuit Breakers and Fuses Plug-in Circuit Breaker InstallationBolt-in Circuit Breaker Installation 2 Circuit Breaker Alarm WiringTelecom Fuse Installation GMT Fuse InstallationCircuit Breaker Connections 1 to 50 Amps Load ConnectionsCable Size Considerations Circuit Breaker Connections 60-100 AmpsFront Panel DB9 Connection Monitoring and Relay Output ConnectionsGMT Fuse Connections Smart Cable DB9 ConnectionRJ45 Ethernet Connector Relay Output ConnectionsExternal Alarm Input Connections NO-NC-CRectifier Module Installation Battery Visual and Safety Inspection Commissioning and Preventive MaintenanceElectrical Installation Pre-Commissioning InspectionAC Power Up CommissioningInitial Set-up Rectifier Test DC Power UpBattery Power Up LVD TestUser Inputs Battery Temperature CompensationCircuit Breaker/ Fuse Test Output RelaysFinal Inspection Operation Technical DescriptionRectifier Management System Voltage Control System ManagementSystem Output Capacity System CurrentBattery Charging and Protection Battery ManagementSystem Status and Alarm Reporting DC DistributionControls and Indicators Battery/Load Low Voltage DisconnectFront Panel User Interface Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default ValuesAddress Alarm ItemNo Alarms Switzer70.0 C Batt HT AlmBatt HT Thr Batt HV AlmCir Bkr 72 Almm+ Cir Bkr 1 Alm m+Major Comp HkneeHw Batt C Almm+ Fuse 1 AlmFuse 16 Alm Minor48.00 LVD ResetLVD Option LVD TripOut-Rly 6 Dly m+ Out-Rly 1 Dly m+Sec Relay MajorMRF28H54 DisableRect 1 Desc Rect 1ofN Almm+Sys LT Alm Sys HV AlmSys HV Thr Sys LT ThrTime 90025SYS MS System Module SET-ALM Setup DA Control Unit Menu StructureV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin Modrec AM Info Modfuse LM Alias Fuse MOD Modlvd Modlvd LM Param Alarm Outputs Output Relays Front Panel LED IndicatorsSection External Alarm Inputs Input Relays Description Command and Monitoring ProtocolRemote Monitoring Physical ConnectionsEquipment Preventive MaintenanceSystem Visual and Safety Inspection InspectionTest System Voltage TestRectifier Current Test Battery Current Test Rectifier Alarm TestSystem Temperature Test Rectifier Current Share TestBattery Temperature Test Battery Preventive Maintenance ProcedureFinal Inspection 1MRF28H54BV Rectifiers SpecificationsAC Input 1MRF28H54BV50 RectifiersVDC RectifiersPower Shelf Control Unit Mechanical EnvironmentalCompliance Toll Free APC Worldwide Customer SupportUS and Canada WorldwideLimited Product Warranty