APC BC300 Series manual External Connection Board

Page 18

Installation

3.3.5 External Connection Board

Use Class 1 wiring methods.

Figure 10 External Connection Board

990-1401

18

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

Image 18
Contents APC BC300 Series 40kW 208/450/480V Installation Guide Copyright 2002 APC Denmark ApSInstallation Guide APC BC300 Series 40kW 208/450/480V UPS Safety Symbols used in this manualThank You Contents Tools and Equipment Needed IntroductionIntroduction Insulated Tools and Other Equipment NeededReceiving, Unpacking and Moving to Site Please RecycleInstallation InstallationRequirements on Site Installing the Conduit Connection Kit UPS Footprint measurements in inches & mm FootprintInsulated and other tools required Conduit Connection Kit Contents Installing PedestalsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview door open Component OverviewWire Terminals Wire TerminalsWiring Diagram for BC300 Utility inputSingle Line Diagram for BC300 Single Line DiagramSingle Line Diagram 40kW 69A UPS Model Input Output Recom DC Voltage DC Current Mended MIBExternal Connection Board External Connection BoardCommunication Interface Board Option Communication Interface BoardSmart Slot and Connection of Triple Chassis Communication InterfaceProduct Description Safety WarningsAPC BC300 Triple Chassis Monitoring PortInstalling Management Cards Power InputInstalling Management Products To UPS PortPower Considerations Cascading setup of the APC BC300 Triple ChassisPowering the APC BC300 Triple Chassis Power AdaptersTroubleshooting Triple Chassis Power ConsiderationsDetermining Power Requirements Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Battery Installation Installation of External Batteries and Battery BreakerPower, Physical, and Environmental Specifications PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogStart-up from Maintenance Bypass Start-up and Shutdown ProcedureStart-up and Shutdown Procedure Shutdown ProcedureIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Battery Specifications Dimensions/WeightAPC Corporate How to Contact APCHow to Contact APC Fairgrounds Road West Kingston, RIHow to Contact APC