APC BC300 Series manual Triple Chassis Power Considerations, Determining Power Requirements

Page 24

Installation

3.5.4.4 Triple Chassis Power Considerations

The Triple Chassis receives its power from the UPS through the supplied 24 VDC universal adapter. The total current required by your management products must not exceed the 850 mA limit of the power adapter. See “Determining power requirements”.

3.5.4.5 Determining Power Requirements

To determine the total amount of current required by your management products, add the individual current requirements for each management product to be installed with the APC BC300 Triple Chassis to the current requirements of the chassis itself.

Management Product

Draw (mA)

 

 

Share-UPS 8-port Interface Expander

65

 

 

Expansion Chassis

30

 

 

Triple Chassis

20

 

 

APC BC300 Triple Chassis

90

 

 

Web/SNMP Management Card

110

 

 

Interface Expander

45

 

 

Out-of-Band Management Card

35

 

 

Environmental Monitoring Card

60

 

 

Isolated Extension Cable

50

 

 

Remote Power-Off Device

35

 

 

3.5.5 Troubleshooting

The following table shows the solutions to common problems with the operation of the Triple Chassis

Problem

Possible Cause

Solution

 

 

 

Status LED is off

The chassis is not

See “Powering the APC BC300

 

receiving adequate

Triple Chassis”, and verify that you

 

power.

are not exceeding current

 

 

requirements.

 

 

 

Status LED is flashing

The chassis has not been

Configure the Silcon Triple Chassis.

quickly

configured.

See the Web/SNMP Management

 

 

Card Installation Guide on the CD

 

 

for more information.

 

 

 

Status LED is flashing

The chassis is not

Verify that the supplied UPS cable is

slowly

communicating with the

properly connected to the Triple

 

UPS.

Chassis and to a communications

 

 

port on the UPS.

 

 

 

Attached management

The management

You may be able to upgrade the

product cannot identify

firmware does not

firmware of the management

UPS model or nominal

support 3-phase UPSs.

product. Call APC Customer

output voltage.

 

Support.

 

 

 

3.5.5.1 If Problems Persist

For problems not covered in the troubleshooting chart or for persistent problems, follow this procedure:

990-1401

24

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

Image 24
Contents APC BC300 Series 40kW 208/450/480V Installation Guide Copyright 2002 APC Denmark ApSInstallation Guide APC BC300 Series 40kW 208/450/480V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionTools and Equipment Needed Insulated Tools and Other Equipment NeededReceiving, Unpacking and Moving to Site Please RecycleInstallation InstallationRequirements on Site Installing the Conduit Connection Kit UPS Footprint measurements in inches & mm FootprintInsulated and other tools required Conduit Connection Kit Contents Installing PedestalsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview door open Component OverviewWire Terminals Wire TerminalsWiring Diagram for BC300 Utility inputSingle Line Diagram for BC300 Single Line DiagramSingle Line Diagram 40kW 69A UPS Model Input Output Recom DC Voltage DC Current Mended MIBExternal Connection Board External Connection BoardCommunication Interface Board Option Communication Interface BoardSmart Slot and Connection of Triple Chassis Communication InterfaceSafety Warnings APC BC300 Triple ChassisProduct Description Monitoring PortPower Input Installing Management ProductsInstalling Management Cards To UPS PortCascading setup of the APC BC300 Triple Chassis Powering the APC BC300 Triple ChassisPower Considerations Power AdaptersTriple Chassis Power Considerations Determining Power RequirementsTroubleshooting Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Installation of External Batteries and Battery Breaker Power, Physical, and Environmental SpecificationsBattery Installation PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogStart-up and Shutdown Procedure Start-up and Shutdown ProcedureStart-up from Maintenance Bypass Shutdown ProcedureIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Battery Specifications Dimensions/WeightHow to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RIHow to Contact APC