Contents:
1.0 | Introduction | 4 |
| 1.1 Tools and Equipment Needed | 4 |
2.0Receiving, Unpacking, Moving
| and Storing the UPS and Batteries | 5 | |
| 2.1 | Receiving, Unpacking and Moving to Site | 5 |
| 2.2 | Storing the UPS and Batteries | 5 |
3.0 | Installation | 6 | |
| 3.1 | Requirements on Site | 6 |
| 3.1.1 | UPS Footprint (measurements in inches & mm) | 7 |
| 3.2 | Installing the Conduit Connection Kit | 7 |
| 3.2.1 | Conduit Connection Kit Contents | 8 |
| 3.2.2 | Installing Pedestals | 8 |
| 3.2.3 | Installing Conduit Box and Base Covers | 8 |
| 3.3 | Installing the Maintenance Bypass Panel and UPS | 9 |
| 3.3.1 | Component Overview (door open) | 11 |
| 3.3.2 | Wire Terminals | 12 |
| 3.3.3 | Wiring Diagram for BC300 | 13 |
| 3.3.4 | Single Line Diagram for BC300 | 14 |
| 3.3.5 | External Connection Board | 18 |
| 3.3.6 | Communication Interface Board (Option) | 19 |
| 3.4 | Smart Slot and Connection of Triple Chassis | 20 |
| 3.5 | APC BC300 Triple Chassis | 21 |
| 3.5.1 | Safety Warnings | 21 |
| 3.5.2 | Product Description | 21 |
| 3.5.3 | Installing Management Products | 22 |
| 3.5.4 | Powering the APC BC300 Triple Chassis | 23 |
| 3.5.5 | Troubleshooting | 24 |
| 3.5.6 | Product Specifications | 25 |
| 3.6 | Installation of External Batteries and Battery Breaker | 27 |
| 3.6.1 | Battery Installation | 27 |
| 3.6.2 | Battery Replacement | 30 |
4.0 | Initial | 31 | |
| 4.1 | Initial | 31 |
5.0 | Clearing the Events Log | 32 | |
6.0 | 33 | ||
| 6.1 | 33 | |
| 6.2 | Shutdown Procedure | 33 |
7.0 | Technical Specifications | 35 | |
| 7.1 | APC BC300 Series 40 kW Technical Data | 35 |
| 7.2 | Battery Specifications | 36 |
| 7.3 | Dimensions/Weight | 36 |
8.0 | How to Contact APC | 37 |
| |
|
|
Installation Guide APC BC300 Series 40kW 208/450/480V UPS | 3 |