APC BC300 Series manual Single Line Diagram 40kW

Page 15

Installation

Utility Source (provided by others)

450V 3 Wire + Ground

MIB

95AT

75A

Service

F4, 5, 6

Bypass

UIF

Panel

 

Q001

 

UIS

 

75A

51A

UPS

200A

51A

F1, 2, 3

UOF

Q002

Q003

UOS

BS

51A

UPS System Output

40kW

450V 3 Wire + Ground

Notes:

1.Must be 3 wire + Ground

2.Must be 3 wire + Ground cabling provided by others.

3.Input overcurrent protection is based on 80% rating - any deviation, please contact APC.

4.F1, F2, F3 = 60A

5.F4, F5, F6 = 80A

6.All AC power cabling is 3 wire + Ground at 208VAC 3-phase.

7.UPS output cables and input cables must be in separate conduits.

8.Power wiring and control wiring must be in separate conduits.

9.See installation manual for battery information.

10.Installation must comply with all applicable national and local codes.

Figure 8 - Single Line Diagram 40kW 450V

 

990-1401

 

 

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

15

Image 15
Contents Copyright 2002 APC Denmark ApS APC BC300 Series 40kW 208/450/480V Installation GuideInstallation Guide APC BC300 Series 40kW 208/450/480V UPS Safety Symbols used in this manualThank You Contents Insulated Tools and Other Equipment Needed IntroductionIntroduction Tools and Equipment NeededPlease Recycle Receiving, Unpacking and Moving to SiteInstallation InstallationRequirements on Site Installing the Conduit Connection Kit UPS Footprint measurements in inches & mm FootprintInsulated and other tools required Conduit Connection Kit Contents Installing PedestalsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview Component Overview door openWire Terminals Wire TerminalsUtility input Wiring Diagram for BC300Single Line Diagram Single Line Diagram for BC300Single Line Diagram 40kW 69A MIB UPS Model Input Output Recom DC Voltage DC Current MendedExternal Connection Board External Connection BoardCommunication Interface Board Communication Interface Board OptionCommunication Interface Smart Slot and Connection of Triple ChassisMonitoring Port Safety WarningsAPC BC300 Triple Chassis Product DescriptionTo UPS Port Power InputInstalling Management Products Installing Management CardsPower Adapters Cascading setup of the APC BC300 Triple ChassisPowering the APC BC300 Triple Chassis Power ConsiderationsProblem Possible Cause Solution Triple Chassis Power ConsiderationsDetermining Power Requirements TroubleshootingProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Physical Installation of External Batteries and Battery BreakerPower, Physical, and Environmental Specifications Battery InstallationBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogShutdown Procedure Start-up and Shutdown ProcedureStart-up and Shutdown Procedure Start-up from Maintenance BypassIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Dimensions/Weight Battery SpecificationsFairgrounds Road West Kingston, RI How to Contact APCHow to Contact APC APC CorporateHow to Contact APC