Installation

1)Make sure that the chassis is powered off.

2)Install management cards into the housings on the rear of the chassis. See the instructions supplied with the cards and the table above.

3)If you are cascading other APC external management products to the APC BC300 Triple Chassis: Connect the UPS cable (supplied with the management card) to the monitoring port of the chassis and to the “To UPS” port of the other management products (Share-UPS, MasterSwitch, etc.). See “Cascading setup of the APC BC300 Triple Chassis”.

4)Power the APC BC300 Triple Chassis and all external management cards.

NOTICE!

If your configuration requires additional power, connect a 24V AC/DC power adapter available from APC for all models of Triple Chassis.

3.5.3.3 Cascading setup of the APC BC300 Triple Chassis

If you need more than the three card slots available with the APC BC300 Triple Chassis, or if you want to use other external management products, you can connect management products in a cascade series, provided that the total amperage of all installed management products — cards and external — does not exceed the supplied amperage. (See “Determining Power Requirements”).

NOTICE!

When cascading Triple Chassis units, you may need to use a power adapter.

To add card slots, you can cascade the APC BC300 Triple Chassis with the standard Triple Chassis management product, installing the APC BC300 Triple Chassis closer to the UPS.

3.5.4 Powering the APC BC300 Triple Chassis

The APC BC300 Triple Chassis supplies power to the installed management cards and to the Monitoring port, allowing you to power multiple management products.

3.5.4.1 Power Considerations

If the total current required by all the installed management products exceeds 500 mA, you must use a 24 VDC power adapter. To find out whether you need additional power see “Determining power requirements”.

3.5.4.2 Power Adapters

APC offers two different 24 VDC power adapters.

The standard adapter can provide an additional 400 mA.

The universal adapter can provide 850 mA.

3.5.4.3Using a Power Adapter

Plug the adaptor into a protected power outlet and into the Optional Power port of the APC BC300 Triple Chassis.

NOTICE!

If the power adapter loses power because of a UPS shutdown, its attached management products may not operate properly, thus adversely affecting the UPS and its protected equipment.

990-1401

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

23

Image 23
Contents Copyright 2002 APC Denmark ApS APC BC300 Series 40kW 208/450/480V Installation GuideThank You Installation Guide APC BC300 Series 40kW 208/450/480V UPSSafety Symbols used in this manual Contents Insulated Tools and Other Equipment Needed IntroductionIntroduction Tools and Equipment NeededPlease Recycle Receiving, Unpacking and Moving to SiteRequirements on Site InstallationInstallation Insulated and other tools required Installing the Conduit Connection KitUPS Footprint measurements in inches & mm Footprint Installing Conduit Box and Base Covers Conduit Connection Kit ContentsInstalling Pedestals Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview Component Overview door openWire Terminals Wire TerminalsUtility input Wiring Diagram for BC300Single Line Diagram Single Line Diagram for BC300Single Line Diagram 40kW 69A MIB UPS Model Input Output Recom DC Voltage DC Current MendedExternal Connection Board External Connection BoardCommunication Interface Board Communication Interface Board OptionCommunication Interface Smart Slot and Connection of Triple ChassisMonitoring Port Safety WarningsAPC BC300 Triple Chassis Product DescriptionTo UPS Port Power InputInstalling Management Products Installing Management CardsPower Adapters Cascading setup of the APC BC300 Triple ChassisPowering the APC BC300 Triple Chassis Power ConsiderationsProblem Possible Cause Solution Triple Chassis Power ConsiderationsDetermining Power Requirements TroubleshootingProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Physical Installation of External Batteries and Battery BreakerPower, Physical, and Environmental Specifications Battery InstallationBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check External Batteries Initial Start-up and Phase CheckInitial Start-up and Phase Check Clearing the Events Log Clearing the Events LogShutdown Procedure Start-up and Shutdown ProcedureStart-up and Shutdown Procedure Start-up from Maintenance BypassIf you have shut the loads down Move on to step APC BC300 Series 40 kW Technical Data Technical SpecificationsTechnical Specifications Dimensions/Weight Battery SpecificationsFairgrounds Road West Kingston, RI How to Contact APCHow to Contact APC APC CorporateHow to Contact APC