APC BC300 Series manual Battery Specifications, Dimensions/Weight

Page 36

Technical Specifications

7.2Battery Specifications

 

40kW

 

 

Nominal DC current - Amps

200

 

 

UL rating of terminal blocks - AWGa

14 - 2/0

Nominal DC voltage

216

 

 

Nominal number of cells

108

 

 

Factory-set float charge voltageb

246

Charger current limit - Ampsc

20

Inverter efficiency -% 100% load

91

75% load

91

50% load

89

25% load

86

 

 

a.Terminal block has two positive and two negative 8 mm (=5/16”) studs, hardware provided. Lug re- quired.

Conductor size may vary based on installation re- quirements. Size all conductors per applicable codes.

b.Adjust the float charge voltage setting according to the battery manufacturer’s recommendations. c.Programmable to lower level.

7.3Dimensions/Weight

BC300 Series UPS

40kW

 

 

Height

59.1 inches

 

 

Width

39.4 inches

 

 

Depth

31.7 inches

 

 

Weight

1798 lbs

 

 

990-1401

36

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

Image 36
Contents APC BC300 Series 40kW 208/450/480V Installation Guide Copyright 2002 APC Denmark ApSInstallation Guide APC BC300 Series 40kW 208/450/480V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionTools and Equipment Needed Insulated Tools and Other Equipment NeededReceiving, Unpacking and Moving to Site Please RecycleInstallation InstallationRequirements on Site Installing the Conduit Connection Kit UPS Footprint measurements in inches & mm FootprintInsulated and other tools required Conduit Connection Kit Contents Installing PedestalsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview door open Component OverviewWire Terminals Wire TerminalsWiring Diagram for BC300 Utility inputSingle Line Diagram for BC300 Single Line DiagramSingle Line Diagram 40kW 69A UPS Model Input Output Recom DC Voltage DC Current Mended MIBExternal Connection Board External Connection BoardCommunication Interface Board Option Communication Interface BoardSmart Slot and Connection of Triple Chassis Communication InterfaceSafety Warnings APC BC300 Triple ChassisProduct Description Monitoring PortPower Input Installing Management ProductsInstalling Management Cards To UPS PortCascading setup of the APC BC300 Triple Chassis Powering the APC BC300 Triple ChassisPower Considerations Power AdaptersTriple Chassis Power Considerations Determining Power RequirementsTroubleshooting Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Installation of External Batteries and Battery Breaker Power, Physical, and Environmental SpecificationsBattery Installation PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogStart-up and Shutdown Procedure Start-up and Shutdown ProcedureStart-up from Maintenance Bypass Shutdown ProcedureIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Battery Specifications Dimensions/WeightHow to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RIHow to Contact APC