APC BC300 Series manual Introduction, Tools and Equipment Needed

Page 4

Introduction

1.0 Introduction

This Installation Guide provides information on UPS installation, wiring, start-up and shut- down procedures along with Maintenance Bypass Panel phase check and external battery installation.

Refer to national and local electrical codes prior to installing the UPS system.

1.1Tools and Equipment Needed

This section lists all tools and equipment required to connect the UPS to the Maintenance Bypass Panel.

Insulated Tools and Other Equipment Needed:

Torque wrench in inch-pounds or newton-meters

Standard U.S. and metric wrenches

Petroleum jelly or conductive grease

Brush (for applying petroleum jelly or conductive grease to battery terminals)

Mallet

Volt-Ohm meter (True RMS - Digital)

Pliers

Ratchet and sockets

Electrical tape

Standard and Phillips screwdrivers

Torx head screwdriver set

APC BC300 User Guide

Phase rotation meter

Cables and interconnection hardware is not provided by APC.

990-1401

4

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

Image 4
Contents APC BC300 Series 40kW 208/450/480V Installation Guide Copyright 2002 APC Denmark ApSSafety Symbols used in this manual Installation Guide APC BC300 Series 40kW 208/450/480V UPSThank You Contents Introduction IntroductionTools and Equipment Needed Insulated Tools and Other Equipment NeededReceiving, Unpacking and Moving to Site Please RecycleInstallation InstallationRequirements on Site UPS Footprint measurements in inches & mm Footprint Installing the Conduit Connection KitInsulated and other tools required Installing Pedestals Conduit Connection Kit ContentsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview door open Component OverviewWire Terminals Wire TerminalsWiring Diagram for BC300 Utility inputSingle Line Diagram for BC300 Single Line DiagramSingle Line Diagram 40kW 69A UPS Model Input Output Recom DC Voltage DC Current Mended MIBExternal Connection Board External Connection BoardCommunication Interface Board Option Communication Interface BoardSmart Slot and Connection of Triple Chassis Communication InterfaceSafety Warnings APC BC300 Triple ChassisProduct Description Monitoring PortPower Input Installing Management ProductsInstalling Management Cards To UPS PortCascading setup of the APC BC300 Triple Chassis Powering the APC BC300 Triple ChassisPower Considerations Power AdaptersTriple Chassis Power Considerations Determining Power RequirementsTroubleshooting Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Installation of External Batteries and Battery Breaker Power, Physical, and Environmental SpecificationsBattery Installation PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogStart-up and Shutdown Procedure Start-up and Shutdown ProcedureStart-up from Maintenance Bypass Shutdown ProcedureIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Battery Specifications Dimensions/WeightHow to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RIHow to Contact APC