This section contains instructions on how to start the UPS from maintenance bypass. The steps in this procedure apply to units with an APC-supplied Maintenance Bypass Panel.

1.Make sure that the following switches are in the following positions:

The UPS AC disconnect switch should be “OFF”. The UPS bypass switch should be on “LINE”. The battery breaker should be “OFF”.

2.Switch the UPS AC disconnect switch “ON”. The UPS display should show “System type xxkVA xxxV”.

3.Within 20 seconds, the UPS display should show **Stand-by** and an audible alarm should sound.

4.Ensure that the external battery breaker for the battery system is set to “OFF”.

5.Turn the pre-charge/discharge switch to the “pre-charge” position and keep it in this position until the LED turns off.

6.Switch the battery breaker “ON”.

7.Press the green “ON” button located inside the front door of the UPS. The UPS display should show “Normal operation load power xx%”.

8.Program the unit into static bypass operation:

a.Press to access the user parameters.

b.Press the or key until the display shows “Bypass operation: OFF”.

c. Press to turn static bypass operation on. The display should show “Bypass operation”.

9.Set the UPS bypass switch to “UPS”.

10.Program the unit to normal operation:

a.Press to access the user parameters.

b.Press the or key until the display shows “Bypass operation: ON”.

c. Press to turn static bypass operation off. The display should show “Normal operation load power xx%”.

6.2Shutdown Procedure

WARNING

After shutting down the unit, wait at least five minutes before removing any access panels or covers. Access panels should be removed by authorized service personnel only.

After the UPS has been shut down, the unit may still contain high voltages.

TEST BEFORE YOU TOUCH!

Before continuing, read the warnings on the inside front cover of this manual.

990-1401

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

33

Image 33
Contents Copyright 2002 APC Denmark ApS APC BC300 Series 40kW 208/450/480V Installation GuideInstallation Guide APC BC300 Series 40kW 208/450/480V UPS Safety Symbols used in this manualThank You Contents Introduction IntroductionTools and Equipment Needed Insulated Tools and Other Equipment NeededPlease Recycle Receiving, Unpacking and Moving to SiteInstallation InstallationRequirements on Site Installing the Conduit Connection Kit UPS Footprint measurements in inches & mm FootprintInsulated and other tools required Conduit Connection Kit Contents Installing PedestalsInstalling Conduit Box and Base Covers Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview Component Overview door openWire Terminals Wire TerminalsUtility input Wiring Diagram for BC300Single Line Diagram Single Line Diagram for BC300Single Line Diagram 40kW 69A MIB UPS Model Input Output Recom DC Voltage DC Current MendedExternal Connection Board External Connection BoardCommunication Interface Board Communication Interface Board OptionCommunication Interface Smart Slot and Connection of Triple ChassisAPC BC300 Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Products Power InputInstalling Management Cards To UPS PortPowering the APC BC300 Triple Chassis Cascading setup of the APC BC300 Triple ChassisPower Considerations Power AdaptersDetermining Power Requirements Triple Chassis Power ConsiderationsTroubleshooting Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Power, Physical, and Environmental Specifications Installation of External Batteries and Battery BreakerBattery Installation PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check Initial Start-up and Phase CheckInitial Start-up and Phase Check External Batteries Clearing the Events Log Clearing the Events LogStart-up and Shutdown Procedure Start-up and Shutdown ProcedureStart-up from Maintenance Bypass Shutdown ProcedureIf you have shut the loads down Move on to step Technical Specifications Technical SpecificationsAPC BC300 Series 40 kW Technical Data Dimensions/Weight Battery SpecificationsHow to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RIHow to Contact APC