APC BC300 Series manual Do not connect the negative cables to the UPS yet

Page 29

Installation

Clean cables and battery terminals before making the battery connections. Apply a thin coating of conductive grease before making the battery connections, or, after connection, apply petroleum jelly to the entire connection.

Torque battery connections to the battery manufacturer’s specifications.

Follow below battery system guidelines and any instructions shipped with the battery system:

1.Verify that the DC fuses are removed from the UPS. See Component Overview illustration for the location of the DC fuse holder.

2.Install the ground conductor. See Wiring Termination illustration for the location of the grounding electrode terminals in the UPS.

3.Connect the cables between batteries.

a.In each battery string, connect the cables between batteries as shown in the battery installation diagram provided with the batteries.

b.Meter the positive (+) and negative (-) terminal on each battery string to verify proper nominal voltage and polarity.

4.Connect the battery cables between battery strings.

a.Connect the negative (-) cables between battery strings as shown in the battery installation diagram provided with the batteries.

b.Meter the DC voltage between the positive terminals of the strings. The voltage should measure less than 5 volts. If it exceeds 5 volts, correct any wiring errors

before you continue.

c.Connect the positive (+) cables between battery strings as shown in the battery installation diagram provided with the batteries.

5.Install the battery breaker and pre-charge/discharge switch. Refer to

any instructions provided with the battery breaker and pre-charge/discharge switch.

6.Connect the external batteries to the UPS.

a.Connect the positive (+) cable(s) to the UPS first. Install ring connectors for 8 mm (approx. 5/16”) bolts as required.

b.To prevent short circuits, insulate the UPS end of the negative (-) cable(s).

CAUTION!

Do not connect the negative (–) cables to the UPS yet.

c.Connect the positive (+) cable(s) to the battery system and tighten to the proper torque specifications.

d.Connect the negative (S) cable(s) to the battery system and tighten to the proper torque specifications.

7.Check the DC voltage.

a.Connect the DC fuse(s) as shown in the battery installation diagram provided with the batteries. Verify proper voltage (216 VDC) and polarity at the battery pack.

b.Set the battery breaker to “ON”.

c.Meter for proper nominal DC voltage at the UPS end of the cables. Make sure the polarity agrees with the markings on the UPS battery input terminals.

d.After checking the DC voltage, set the battery breaker to “OFF”.

8.Connect the negative (-) cable(s) to the UPS. Tighten to the proper torque specifications.

9.Replace all covers.

10.Continue with the “Initial Start-up and Phase Check” section in this Installation Guide.

990-1401

Installation Guide APC BC300 Series 40kW 208/450/480V UPS

29

Image 29 Contents
Copyright 2002 APC Denmark ApS APC BC300 Series 40kW 208/450/480V Installation GuideThank You Installation Guide APC BC300 Series 40kW 208/450/480V UPSSafety Symbols used in this manual Contents Introduction IntroductionTools and Equipment Needed Insulated Tools and Other Equipment NeededPlease Recycle Receiving, Unpacking and Moving to SiteRequirements on Site InstallationInstallation Insulated and other tools required Installing the Conduit Connection KitUPS Footprint measurements in inches & mm Footprint Installing Conduit Box and Base Covers Conduit Connection Kit ContentsInstalling Pedestals Installing the Maintenance Bypass Panel and UPS SBP Electrical Schematic Component Overview Component Overview door openWire Terminals Wire TerminalsUtility input Wiring Diagram for BC300Single Line Diagram Single Line Diagram for BC300Single Line Diagram 40kW 69A MIB UPS Model Input Output Recom DC Voltage DC Current MendedExternal Connection Board External Connection BoardCommunication Interface Board Communication Interface Board OptionCommunication Interface Smart Slot and Connection of Triple ChassisAPC BC300 Triple Chassis Safety WarningsProduct Description Monitoring PortInstalling Management Products Power InputInstalling Management Cards To UPS PortPowering the APC BC300 Triple Chassis Cascading setup of the APC BC300 Triple ChassisPower Considerations Power AdaptersDetermining Power Requirements Triple Chassis Power ConsiderationsTroubleshooting Problem Possible Cause SolutionProduct Specifications Monitoring Port Pin Assignments Monitoring Port Pin Assignment Power, Physical, and Environmental Specifications Installation of External Batteries and Battery BreakerBattery Installation PhysicalBattery Installation Guidelines Do not connect the negative cables to the UPS yet Battery Replacement Initial Start-up and Phase Check External Batteries Initial Start-up and Phase CheckInitial Start-up and Phase Check Clearing the Events Log Clearing the Events LogStart-up and Shutdown Procedure Start-up and Shutdown ProcedureStart-up from Maintenance Bypass Shutdown ProcedureIf you have shut the loads down Move on to step APC BC300 Series 40 kW Technical Data Technical SpecificationsTechnical Specifications Dimensions/Weight Battery SpecificationsHow to Contact APC How to Contact APCAPC Corporate Fairgrounds Road West Kingston, RIHow to Contact APC
Related manuals
Manual 38 pages 11.26 Kb