Extron electronic MKP 2000 user manual Quick Start Guide MKP

Page 3

Quick Start Guide — MKP 2000

Install and set up the MKP 2000 as follows:

Step 1

Turn all of the equipment off and disconnect it from the power source.

Step 2

Install the cables to and from the control panel in a wall, podium, or desk. See Rear Panel and Side Panel Connections in chapter 2, Installation, for guidelines.

Step 3

Prepare the wall, podium, desk, or other surface to mount the MKP. See Preparing the site, installing the mud ring or wall box in chapter 2, Installation.

Step 4

Install the control panel in a wall, podium, desk, or other surface. See Mounting the MKP to the mud ring or wall box in chapter 2, Installation.

Step 5

Connect the input and output cables. See Rear Panel and Side Panel Connections in chapter 2, Installation, for guidelines.

Step 6

Connect the power supply. See Power supply wiring in chapter 2, Installation.

Step 7

Connect power cords and turn on the equipment in the following order: output devices (such as projectors or monitors), the connected matrix switcher, and input devices (such as DSSs or cable boxes).

Step 8

If necessary, set the control panel’s and matrix switcher’s IP parameters. See Viewing and configuring the IP and and MKP set-up parameters in chapter 3, Local Operation, or System Settings Page in chapter 5, HTML Operation.

Step 9

If necessary, set the control panel’s RS-232 port for pass-through or no-pass-through mode and whether the MKP is the primary device (connected to the switcher) or secondary device (connected through another device). See Viewing and configuring the IP and and MKP set-up parameters in chapter 3, Local Operation, or System Settings Page in chapter 5, HTML Operation.

MKP 2000 Remote Control Panel • Quick Start Guide QS-1

Image 3
Contents MKP Remote Control PanelExtron’s Warranty PrecautionsQuick Start Guide MKP Table of Contents Introduction MKP 2000 Remote Control PanelTable of Contents, cont’d OneMKP 2000 Remote Control Panel Introduction About the MKP 2000 Remote Control PanelRS-232 connection to the switcher Ethernet connection to the switcherTwo InstallationInstallation Procedures InstallationMKP Installation Overview UL Requirements for Wall Box InstallationTo meet the UL listing requirements, this device must be Installation, cont’dPreparing the site, installing the mud ring or wall box Installed in a wall boxDetail a Mounting the MKP to the mud ring or wall boxRear Panel and Side Panel Connections SwitchRS-232 cable termination Control connectionsTP cable termination 11 RJ-45 connector and pinout tablesPower supply wiring ThreeLocal Operation Front Panel Operations MKP 2000 Remote Control Panel Local OperationLocal Operation Front Panel Controls and IndicationsViewing and configuring the IP and MKP set-up parameters Local Operation, cont’dViewing the last input or output tied from the MKP Input Output Take Host control port setting and pass-through communicationsRear Panel Resets Control panel security lockout executive modePerforming soft resets Performing a hard reset FourSIS Operation Host-to-MKP Instructions SIS OperationRS-232 Links Ethernet LinkMKP Error Responses Using the Command/Response TableSIS Operation, cont’d Symbol definitions for MKP SIS commands Xxx.xxWhere Command/response table for MKP SIS commands SIS Operation Cont’dMKP Html Operation FiveMKP 2000 Remote Control Panel Html Operation Html OperationDownload the Startup Html Operation, cont’d System Status System SettingsIP Settings section Switcher Settings sectionHtml Operation, cont’d Authorized inputs and authorized outputs Port RS-232 SettingsDate/Time Settings fields Front panel configuration lockFirmware Upgrade Html Operation, cont’d PasswordsFile Management AAppendix a Reference DataHtml Operation, cont’d Special Characters Specifications Reference DataPart Numbers Drawn to scale may be used as a template Reference Data, cont’d Mounting and Cabling SpecificationsElectrical box cutout Panel mount cutout templateExtron Comm-Link cable Reference Data, cont’d