Extron electronic MKP 2000 user manual MKP Installation Overview, Installation Procedures

Page 8

Installation

CAUTION

Installation and service must be performed by

 

authorized personnel only. UL Listed electrical

 

boxes are recommended. See UL Requirements

 

for Wall Box Installation on the next page.

The MKP 2000 remote control panel should be installed in a standard, 2-gang electrical wall box (figure 2-1). Figure 2-1 shows the MKP installed in a wall. This could also be in a desk, a podium, or any other convenient location.

The procedures provided here assume that the electrical wall boxes and the cables have been installed for the system. Rear Panel and Side Panel Connections, starting on page 2-8 provides guidance for terminating the cables.

MKP Installation Overview

To install an MKP 2000 remote control panel, follow these steps:

1Disconnect power from the matrix switcher and all MKPs in the system.

2Prepare the site: cut a hole in the wall/furniture, install the electrical box or mud ring, and prepare the cables. Instructions are included in this manual and/or with the wall box. See Preparing the site, installing the mud ring or wall box in this chapter.

3Connect the cable between the MKP and the

matrix switcher. See Rear Panel and Side Panel Connections on page 2-8.

4Connect power cords to the MKP and the matrix switcher.

5Test the MKP’s ability to communicate with the matrix switcher.

6Disconnect power from all the devices.

7Mount the MKP into the electrical box or to the mud ring. If using a wall box, see Mounting the control panel to the mud ring or wall box in this chapter.

8Restore power to the devices.

UL Requirements for Wall Box Installation

The following Underwriters Laboratories (UL) requirements pertain to the installation of the MKP 2000 into a wall or furniture (figure 2-1).

 

 

3

 

 

2

 

OUTPUT

 

1

6

INPUT

 

5

 

R

4

9

TAKE

 

8

 

 

 

7

CANC

EL

 

0

 

0

 

BACK

 

 

 

200

 

 

 

MKP

Figure 2-1 — MKP mounted in a wall box

1.

These units are not to be connected to a centralized DC

 

power source or used beyond their rated voltage range.

2.

These units must be installed in UL listed junction boxes.

3.

These units must be installed with conduit in accordance

 

with the National Electrical Code.

Installation Procedures

The MKPs are mounted into a wall, furniture, or any other convenient location. Follow the instructions appropriate to the mounting option you have selected.

CAUTION

The control panel must be installed into an

 

Underwriters Laboratories (UL) approved electrical

 

wall box.

When installing MKP control panels, you must conform to all national and local electrical codes.

2-2

MKP 2000 Remote Control Panel • Installation

MKP 2000 Remote Control Panel • Installation

2-3

Image 8
Contents Remote Control Panel MKPPrecautions Extron’s WarrantyQuick Start Guide MKP Table of Contents MKP 2000 Remote Control Panel Table of Contents, cont’dOne IntroductionAbout the MKP 2000 Remote Control Panel RS-232 connection to the switcherEthernet connection to the switcher MKP 2000 Remote Control Panel IntroductionInstallation TwoInstallation MKP Installation OverviewUL Requirements for Wall Box Installation Installation ProceduresInstallation, cont’d Preparing the site, installing the mud ring or wall boxInstalled in a wall box To meet the UL listing requirements, this device must beMounting the MKP to the mud ring or wall box Detail aSwitch Rear Panel and Side Panel ConnectionsControl connections RS-232 cable termination11 RJ-45 connector and pinout tables TP cable terminationLocal Operation Power supply wiringThree MKP 2000 Remote Control Panel Local Operation Local OperationFront Panel Controls and Indications Front Panel OperationsViewing the last input or output tied from the MKP Viewing and configuring the IP and MKP set-up parametersLocal Operation, cont’d Host control port setting and pass-through communications Input Output TakePerforming soft resets Rear Panel ResetsControl panel security lockout executive mode SIS Operation Performing a hard resetFour SIS Operation RS-232 LinksEthernet Link Host-to-MKP InstructionsSIS Operation, cont’d MKP Error ResponsesUsing the Command/Response Table Where Symbol definitions for MKP SIS commandsXxx.xx Command/response table for MKP SIS commands MKP SIS OperationCont’d Five Html OperationDownload the Startup MKP 2000 Remote Control Panel Html OperationHtml Operation System Settings Html Operation, cont’d System StatusHtml Operation, cont’d IP Settings sectionSwitcher Settings section Port RS-232 Settings Date/Time Settings fieldsFront panel configuration lock Authorized inputs and authorized outputsHtml Operation, cont’d Passwords Firmware UpgradeFile Management Html Operation, cont’d Special Characters AAppendix aReference Data Part Numbers SpecificationsReference Data Reference Data, cont’d Mounting and Cabling Specifications Electrical box cutoutPanel mount cutout template Drawn to scale may be used as a templateReference Data, cont’d Extron Comm-Link cable