33. Remove the 3 1/2” Pulleys (35) from the other | 33 |
|
|
|
|
pair of |
|
|
|
| |
|
|
|
|
| |
Wrap the Ab Cable (74) around a 3 1/2” Pulley |
|
|
|
|
|
(35) in the direction shown. Attach the Pulley and |
|
|
|
|
|
a Cable Trap (38) to the top hole in the pair of |
|
|
|
| 74 |
Pulley Plates (32) with a 3/8” x 2” Bolt (93) and a |
|
|
|
|
|
3/8” Nylon Locknut (90). Make sure the Cable |
|
|
|
| 93 |
Trap is positioned to hold the Cable in the |
|
|
|
| |
|
|
|
|
| |
groove of the Pulley. | 90 |
| 35 | 32 | |
|
| ||||
|
| 32 |
|
| |
|
|
| 38 |
| |
|
|
|
|
| |
34. Wrap the Ab Cable (74) around a 3 1/2” Pulley | 34 |
|
|
|
|
(35) in the direction shown. Attach the Pulley to |
|
|
|
| |
|
|
|
|
| |
the Double | 94 |
|
|
|
|
Bolt (94) and a 3/8” Nylon Locknut (90). |
|
|
|
| |
|
|
|
|
| |
| 31 |
|
|
|
|
| 90 |
|
|
|
|
| 35 |
|
|
|
|
| 74 |
|
|
|
|
35. Wrap the Ab Cable (74) around a 3 1/2” Pulley | 35 |
|
|
|
|
(35) in the direction shown. Attach the Pulley and |
|
|
|
| |
|
|
| 74 |
| |
a Cable Trap (38) to the indicated bracket on the |
| 93 |
|
| |
|
|
|
| ||
Butterfly Base (1) with a 3/8” x 2” Bolt (93) and a |
|
| 35 |
| |
|
|
|
| ||
3/8” Nylon Locknut (90). Make sure the Cable |
|
|
| 38 |
|
Trap is positioned to hold the Cable in the |
|
|
|
| |
|
|
|
|
| |
groove of the Pulley. |
|
|
|
|
|
|
| 1 | 90 |
| |
36. Wrap the Ab Cable (74) around a 3 1/2” Pulley | 36 |
|
|
|
|
(35) in the direction shown. Slide a Cable Trap |
|
|
|
| |
|
|
|
|
| |
(38) and the Pulley onto the 3/8” x 3 1/2” Carriage | 35 | 92 |
| ||
Bolt (95) in the Butterfly Base (1). Secure the |
| ||||
|
|
| |||
|
|
|
|
| |
Pulley with a 3/8” Nylon Jamnut (92). Make sure | 38 |
|
|
|
|
the Cable Trap is positioned to hold the Cable | 74 |
|
|
|
|
in the groove of the Pulley. |
|
|
|
| |
|
|
|
|
| |
| 1 | 95 |
|
|
|
| 16 |
|
|
|
|