INSTALLATION REQUIREMENTS

Tools and Parts

Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools listed here.

Tools needed

8" or 10" Pipe wrench

8' or 10" adjustable wrench

Flat-blade screwdriver

Phillips screwdriver

Adjustable wrench that opens to 1" (2.5 cm) or hex-head socket wrench

Level

⁵⁄₁₆" socket wrench

Utility knife

Vent clamps

Pipe-joint compound resistant to LP gas

Caulk gun and caulk (for installing new exhaust vent)

Pliers

Putty knife

Parts supplied

Remove parts bag from dryer drum. Check that all parts were included.

Wedge cone

Foot boot (4)

Dryer foot (4)

⁵⁄₁₆"-18 x 2 ¹⁄₂" bolt

3 pin timing cam

6 pin timing cam

Location Requirements

WARNING

Explosion Hazard

Keep flammable materials and vapors, such as gasoline, away from dryer.

Do not install in a garage.

Failure to do so can result in death, explosion, or fire.

If installing a gas dryer:

IMPORTANT: Observe all governing codes and ordinances.

Check code requirements: Some codes limit or do not permit installation of clothes dryers in garages, closets, or sleeping quarters. Contact your local building inspector.

Make sure that lower edges of the cabinet, plus the back and bottom sides of the dryer, are free of obstructions to permit adequate clearance of air openings for combustion air. See “Recessed Area and Closet Installation Instructions” below for minimum spacing requirements.

NOTE: The dryer must not be installed in an area where it will be exposed to water and/or weather.

Recessed Area and Closet Installation Instructions

This dryer may be installed in a recessed area or closet. For recessed area and closet installations, minimum clearances can be found on the serial tag on the dryer.

The installation spacing is in inches and is the minimum allowable. Additional spacing should be considered for ease of installation, servicing, and compliance with local codes and ordinances.

If closet door is installed, the minimum unobstructed air opening in the top and bottom is required. Louvered doors with equivalent air openings are acceptable.

The dryer must be exhausted outdoors.

No other fuel-burning appliance may be installed in the same closet as the dryer.

4

Image 4
Contents Table of Contents/Table des matières 8577208Dryer Safety What to do if YOU Smell GAS Recessed Area and Closet Installation Instructions Tools and PartsLocation Requirements Tools neededProduct Dimensions 27 68.6 cm dryer Product Dimensions 29 73.7 cm dryerMinimum Installation Clearances Recessed front viewElectrical Requirements Electric Dryer Electrical Requirements Gas DryerRecommended Ground Method Type of Gas Gas Supply RequirementsFor a grounded, cord-connected dryer Venting Requirements Gas Supply Pressure TestingGas Supply Line Do not install screening or cap over the end of the vent Vent System Length Multiple Dryer VentingMaximum Vent Length If an exhaust hood cannot be usedComplete Installation Install Coin Slide and Coin BoxConnect Vent Power Supply Cord Method U.S. Only Make Electrical ConnectionPower Supply Cord, Four-wire electrical connection Remove hold-down screw and the terminal block coverPower Supply Cord, Three-wire electrical connection EDCDirect Wire Method U.S. Only Direct Wire Four-wire electrical connectionDirect Wire Three-wire electrical connection Loosen or remove the center terminal block screwChanging to a 30- or 60-MINUTE Timing CAM If dryer does not operate check the following Maintenance instructionsIf you need assistance Page Sécurité DE LA Sécheuse Importantes Instructions DE Sécurité Exigences d’emplacement Outillage et piècesOutillage nécessaire Pièces fourniesDimensions du produit Sécheuse de 27 68,6 cm Dimensions du produit Sécheuse de 29 73,7 cmSpécifications électriques sécheuse à gaz Méthode recommandée de liaison à la terreSpécifications électriques sécheuse électrique Spécifications de l’alimentation en gaz Exigences concernant l’évacuation Type de gazCanalisation de gaz Tests de pressurisation de la canalisation de gazÉvacuation multiple de la sécheuse Longueur du circuit dévacuationLongueur maximale du conduit Installation dune glissière et Dune caisse à monnaie Si une bouche de décharge ne peut être utiliséeRaccordement à la canalisation de gaz Achever l’installationRaccordement du conduit d’évacuation Installation d’une glissière et d’une Caisse à monnaie Raccordement électriqueMéthode du cordon d’alimentation É.-U. seulement Déconnecter la source de courant électriqueCordon d’alimentation, prise de courant à quatre conducteurs Ôter la vis de retenue et le couvercle du bloc de connexionCordon d’alimentation, prise de courant à trois conducteurs Méthode de câblage direct É.-U. seulement Câblage direct, prise de courant à quatre conducteursCâblage direct, prise de courant à trois conducteurs Trois conducteurs avec conducteur de liaisonInstallation D’UNE Came DE Minutage Pour 30 OU 60 Minutes Si la sécheuse ne fonctionne pas, vérifier ce qui suit Instructions d’entretienSi vous avez besoin d’aide 8577208