Whirlpool 8577208 Electrical Requirements Gas Dryer, Electrical Requirements Electric Dryer

Page 6

Electrical Requirements – Gas Dryer

WARNING

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.

Do not remove ground prong.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions can result in death, fire, or electrical shock.

IMPORTANT: The dryer must be electrically grounded in accordance with local codes and ordinances or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, latest edition, or Canadian Electrical Code, CSA C22.1.

If codes permit and a separate ground wire is used, it is recommended that a qualified electrical installer determine that the ground path is adequate.

A copy of the above code standards can be obtained from:

National Fire Protection Association

One Batterymarch Park, Quincy, MA 02269

CSA International

8501 East Pleasant Valley Road

Cleveland, Ohio 44131-5575

A 120-volt, 60-Hz, AC-only, 15- or 20-amp, fused electrical circuit is required. A time-delay fuse or circuit breaker is also recommended. It is recommended that a separate circuit serving only this dryer be provided.

Recommended Ground Method

The dryer, when installed, must be electrically grounded in accordance with local codes or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, latest edition, or Canadian Electrical Code, CSA C22.1, and all local codes and ordinances.

GROUNDING INSTRUCTIONS

For a grounded, cord-connected dryer:

This dryer must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This dryer is equipped with a cord having an equipment- grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

WARNING: Improper connection of the equipment- grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative or personnel if you are in doubt as to whether the dryer is properly grounded. Do not modify the plug provided with the dryer: if it will not fit the outlet, have a proper outlet installed by a qualified electrician.

SAVE THESE INSTRUCTIONS

Electrical Requirements – Electric Dryer

IMPORTANT: The dryer must be electrically grounded in accordance with local codes and ordinances or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, latest edition, or Canadian Electrical Code, CSA C22.1.

The National Electric Code requires a 4-wire supply connection for homes built after 1996, dryer circuits involved in remodeling after 1996, and all mobile home installations.

If codes permit and a separate ground wire is used, it is recommended that a qualified electrical installer determine that the ground path is adequate.

A copy of the above code standards can be obtained from:

National Fire Protection Association

One Batterymarch Park, Quincy, MA 02269

CSA International

8501 East Pleasant Valley Road

Cleveland, Ohio 44131-5575

In U.S.: A four-wire or three-wire, single-phase, 120/240-volt, 60-Hz, AC-only electrical supply (or four-wire or three-wire, 120/208-volt, if specified on the model/serial rating plate) is required on a separate, 30-amp circuit, fused on both sides of the line. A time-delay fuse or circuit breaker is recommended.

In Canada: A four-wire only, single phase 115/230-volt, 60-Hz electrical supply is required on a separate, 30-amp circuit, fused on both sides of the line. A time-delay fuse or circuit breaker is recommended.

6

Image 6
Contents Table of Contents/Table des matières 8577208Dryer Safety What to do if YOU Smell GAS Location Requirements Recessed Area and Closet Installation InstructionsTools and Parts Tools neededMinimum Installation Clearances Product Dimensions 27 68.6 cm dryerProduct Dimensions 29 73.7 cm dryer Recessed front viewElectrical Requirements Gas Dryer Electrical Requirements Electric DryerRecommended Ground Method Gas Supply Requirements Type of GasFor a grounded, cord-connected dryer Gas Supply Pressure Testing Venting RequirementsGas Supply Line Maximum Vent Length Do not install screening or cap over the end of the ventVent System Length Multiple Dryer Venting If an exhaust hood cannot be usedInstall Coin Slide and Coin Box Complete InstallationConnect Vent Power Supply Cord Method U.S. Only Make Electrical ConnectionPower Supply Cord, Four-wire electrical connection Remove hold-down screw and the terminal block coverPower Supply Cord, Three-wire electrical connection EDCDirect Wire Method U.S. Only Direct Wire Four-wire electrical connectionDirect Wire Three-wire electrical connection Loosen or remove the center terminal block screwChanging to a 30- or 60-MINUTE Timing CAM Maintenance instructions If dryer does not operate check the followingIf you need assistance Page Sécurité DE LA Sécheuse Importantes Instructions DE Sécurité Outillage nécessaire Exigences d’emplacementOutillage et pièces Pièces fourniesDimensions du produit Sécheuse de 27 68,6 cm Dimensions du produit Sécheuse de 29 73,7 cmMéthode recommandée de liaison à la terre Spécifications électriques sécheuse à gazSpécifications électriques sécheuse électrique Spécifications de l’alimentation en gaz Canalisation de gaz Exigences concernant l’évacuationType de gaz Tests de pressurisation de la canalisation de gazLongueur du circuit dévacuation Évacuation multiple de la sécheuseLongueur maximale du conduit Installation dune glissière et Dune caisse à monnaie Si une bouche de décharge ne peut être utiliséeAchever l’installation Raccordement à la canalisation de gazRaccordement du conduit d’évacuation Méthode du cordon d’alimentation É.-U. seulement Installation d’une glissière et d’une Caisse à monnaieRaccordement électrique Déconnecter la source de courant électriqueCordon d’alimentation, prise de courant à quatre conducteurs Ôter la vis de retenue et le couvercle du bloc de connexionCordon d’alimentation, prise de courant à trois conducteurs Méthode de câblage direct É.-U. seulement Câblage direct, prise de courant à quatre conducteursCâblage direct, prise de courant à trois conducteurs Trois conducteurs avec conducteur de liaisonInstallation D’UNE Came DE Minutage Pour 30 OU 60 Minutes Instructions d’entretien Si la sécheuse ne fonctionne pas, vérifier ce qui suitSi vous avez besoin d’aide 8577208