Maytag W10151609A If using an existing vent system, If this is a new vent system Vent material

Page 9

If using an existing vent system

Clean lint from the entire length of the system and make sure exhaust hood is not plugged with lint.

Replace any plastic or metal foil vent with rigid or flexible heavy metal vent.

Review Vent system chart. Modify existing vent system if necessary to achieve the best drying performance.

If this is a new vent system

Vent material

Use a heavy metal vent. Do not use plastic or metal foil vent.

4" (10.2 cm) heavy metal exhaust vent and clamps must be used.

Clamps

Use clamps to seal all joints.

Exhaust vent must not be connected or secured with screws or other fastening devices that extend into the interior of the duct. Do not use duct tape.

Clamp

Exhaust

Recommended hood styles are shown here.

B

A

4"

10.2 cm

4" (10.2 cm) heavy metal exhaust vent

Vent products can be purchased from your dealer or by calling Maytag Services. For more information, see the “Assistance or Service” section.

Rigid metal vent

For best drying performance, rigid metal vents are recommended.

Rigid metal vent is recommended to avoid crushing and kinking.

Flexible metal vent

Flexible metal vents are acceptable only if accessible for cleaning.

Flexible metal vent must be fully extended and supported when the dryer is in its final location.

Remove excess flexible metal vent to avoid sagging and kinking that may result in reduced airflow and poor performance.

Do not install flexible metal vent in enclosed walls, ceilings or floors.

Elbows

45° elbows provide better airflow than 90° elbows.

GoodBetter

4"

(10.2 cm)

4" (10.2 cm)

A. Louvered hood style

B. Box hood style

The angled hood style (shown here) is acceptable.

4"

(10.2 cm)

2½" (6.4 cm)

An exhaust hood should cap the vent to keep rodents and insects from entering the home.

Exhaust hood must be at least 12" (30.5 cm) from the ground or any object that may be in the path of the exhaust (such as flowers, rocks or bushes, snow line, etc.).

Do not use an exhaust hood with a magnetic latch.

Improper venting can cause moisture and lint to collect indoors, which may result in:

Moisture damage to woodwork, furniture, paint, wallpaper, carpets, etc.

Housecleaning problems and health problems.

9

Image 9
Contents W10151609A Sécheuse À GAZTable DES Matières Table of ContentsYour safety and the safety of others are very important Dryer SafetyImportant Safety Instructions Installation Instructions Tools and PartsLocation Requirements Dryer Dimensions Mobile Home Additional Installation Requirements Mobile home installations require Gas Supply Requirements Electrical RequirementsGas Type Gas Supply LineVenting Requirements Gas supply pressure testingGas supply connection requirements Burner Input RequirementsIf this is a new vent system Vent material If using an existing vent systemSpecial provisions for mobile home installations Plan Vent SystemDetermine vent path Install Leveling Legs Install Vent SystemVent system chart Make Gas ConnectionLevel Dryer Connect VentReverse Door Swing Optional If the dryer will not start, check the following Complete InstallationStarting Your Dryer Dryer USECleaning the Lint Screen Cleaning the Dryer LocationEvery Load Cleaning Drying Rack OptionRemoving Accumulated Lint Cleaning the Dryer InteriorVacation and Moving Care Changing the Drum LightTroubleshooting Dryer OperationDryer Results Lint on load Cycle time too shortStains on load or drum Loads are wrinkledAccessories Assistance or ServiceU.S.A CanadaONE Year Limited Warranty Maytag Corporation Major Appliance WarrantyVotre sécurité et celle des autres est très importante Sécurité DE LA SécheuseImportantes Instructions DE Sécurité Instructions D’INSTALLATION Exigences d’installationOutillage et pièces nécessaires Espacements d’installation Dimensions de la sécheuse’installation dans une maison mobile exige Spécifications électriques Type de gazGaz naturel Canalisation d’arrivée de gaz de la sécheuse Caractéristiques d’alimentation du brûleurAltitudes supérieures à 10 000 pi 3048 m Épreuve sous pression de l’alimentation en gazEn cas dutilisation du système dévacuation existant Exigences concernant lévacuationÉvacuation Planification du système d’évacuationDéterminer litinéraire dacheminement du conduit Autres installations où le dégagement est réduitInstallation des pieds de nivellement Installation du système d’évacuationRaccordement au gaz Pour utilisation dans une maison mobileMise à niveau de la sécheuse Raccordement du conduit d’évacuationSi la sécheuse ne démarre pas, vérifier ce qui suit Achever l’installationMise en marche de la sécheuse Utilisation DE LA SécheuseNettoyage de lemplacement de la sécheuse Entretien DE LA SécheuseOption grille de séchage Nettoyage de l’intérieur de la sécheuse Nettoyage du filtre à charpieComment enlever la charpie accumulée DéménagementDépannage Changement de l’ampoule du tambourFonctionnement de la sécheuse Résultats de la sécheuse La minuterie ne progresse pas visiblementTemps de programme trop court Assistance OU Service AccessoiresAu Canada Garantie DES Gros Appareils Ménagers Maytag Corporation Tous droits réservés W10151609A SP PN W10151610A