Furuno SC-50 manual Installing the Processor Unit, Deck, bulkhead mount

Page 21

2. INSTALLATION

2.3Installing the Processor Unit

The processor unit should be mounted aligned with the ship’s fore-and-aft line. It can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a mounting location which allows you to easily view the power lamp on the top of the unit and which is within ± 2.5° of the ship’s fore-and-aft line.

2.3.1Deck, bulkhead mount

1.The processor unit is factory adjusted for deck mounting. Fasten the processor unit to the mounting location with tapping screws (5 x 20, 4 pcs.). The unit can also be oriented in one of the directions shown in the figure below. After the unit is installed, you will specify the mounting method from the menu.

Mount processor unit

 

Reference Direction

so reference

 

direction±

is within

 

 

2.5￿of

 

 

POWER switch

fore-and-aft line.

 

Name plate

 

(power lamp)

 

 

 

Connectors

 

 

Processor Unit, top view

 

Bow

 

Bow

 

 

 

 

Mounting Method: "Floor"

Mounting Method: "Floor"

 

 

(Deck)

(Deck)

 

Mounting Direction: A

Mounting Direction: B

Port

Starboard

Port

Starboard

 

 

DIRECTION "A"

 

DIRECTION "B"

 

Stern

 

Stern

 

Bow

 

Bow

 

Mounting Method: "Floor"

Mounting Method: "Floor"

 

 

(Deck)

(Deck)

 

Mounting Direction: C

Mounting Direction: D

Port

Starboard Port

Starboard

DIRECTION "C"

DIRECTION "D"

Stern

Stern

 

Processor unit orientation, deck mounting

2.Fasten the ground wire between the ground terminal on the processor unit and the ship’s hull.

2-12

Image 21
Contents Satellite Compass Safety Instructions Table of Contents Iii MAINTENANCE, TroubleshootingFeatures ForewordWord to the Owner of the SC-50 System configuration System ConfigurationStandard supply Equipment ListOptional equipment Name Type Code No Qty RemarksPrinciple of Operation This page intentionally left blank Installation Mounting ConsiderationsAntenna unit Mast diameter Separation distance minimum Horizontal separation between antenna and mastsAntenna and field of view Display unit, processor unit Example of antenna installed below superstructuresInstalling the Antenna Units Mounting dimensions for antenna, orienting the antennaAntenna unit SC-303 How to fasten the antenna cable Waterproofing the antenna connectorCoating bolt, nut and washers with silicone sealant Cable from antenna No. marked on cableAntenna unit How to insert the cable coverAntenna unit SC-603 How to orient the antenna elementsMounting Antenna unit SC-603Fixing antenna unit to pedestal Orienting the antenna unit Orient the antenna unit as shown in the illustration belowWelding the antenna unit Antenna element Fastening the antenna cableInstalling the Processor Unit Deck, bulkhead mountProcessor unit orientation, deck mounting Installation of processor unit on the underside of a desk Installation on the underside of a deskDesktop, overhead mounting Installing the Display UnitFlush mount Flush mount FFlush mount S Flush mount S kit Type OP20-17, Code NoFlush mount S Wiring General wiring diagramProcessor unit, rear view Sectional view of coaxial cable 3D2V How to install the optional antenna cable setHow to attach connector N-P-8DFB How to attach connector N-P-8DFBInstallation setup menu Initial SettingsConfirming satellite status choosing mounting method Main menuHeading setup menu Choosing heading sourceSatellite tracking status display General wiring Connection of External EquipmentProcessor unit, cover opened Cable Sectional view, fabrication Fabrication of cablesOperation ControlsDisplay unit Turning the Power On/Off Panel Illumination, Display ContrastProcessor unit Description of displays Choosing a DisplayHeading display Nav data displaySteering display Compass displayROT Rate-of-Turn display Set and drift display, speed and distance run display Set and Drift display, Distance Run displayAlarm menu Dgps Alarm SetupDgps alarm options Buzzer optionsSatellite status display Confirming Satellite StatusGPS Setup Displaying the GPS setup menuGPS Setup menu description Disable SV Disable satellite Output DataHeading Baud rate options Data OUT1 menu, sentencesTx interval options IEC, Nmea version optionsHeading talker options Log pulse options Log pulseSystem Setup System Setup menuGeodetic data Using local time Units of measurementTime format Demonstration mode Position fix mode options WAAS/DGPS SetupWAAS/DGPS menu Waas Search optionsProvider GEO Satellite Longitude GEO satellite and coverage areaAUTO/MANUAL options Operation Others Menu HDG Backup optionsOthers menu HDG Restoration optionsTrip menu Trip MenuReset Distance prompt Resetting Distance RunThis page intentionally left blank Preventive Maintenance MAINTENANCE, TroubleshootingTroubleshooting TroubleshootingSymptom Cause Remedy Diagnostic test1 DiagnosticsTest menu options Test start promptPush KEY Diagnostic test sequenceTEST2 display Diagnostic test2Alarm options Diagnostic test3Clearing Data Program NumberProgram version no. display Prompts for erasure of dataBattery Location Type Code No Replacement of BatteryPrompt for exchanging battery Prompt for turning off the powerError Messages Replacement of FuseError Message Meaning Remedy Message displayData ERR Error messages con’t from previousAppendix Menu TreeAP-1 AP-2 SC-50 SpecificationsFuruno IN-1 IndexPacking List SC-501-J/E SC-303 工事材料表 Installation Materials フラッシュマウントキット 20AY-X-9403 SC-50/55/60 20AT-X-9410 Page Page Page