General

3. Start-up

3.1. General

»

F

This chapter is directed at the operator of the equipment.

This chapter assumes general skills in dealing with conveying units and SPS control units.

This chapter assumes that the functional description has been read and understood.

It should be ensured in each and every case that the operators have the relevant skills.

Explosive gases and mixtures of gas and air must not be con- veyed by the vacuum generator. Solid particles and dust must be separated before entry to the vacuum generator.

Check the compressed air supply if pneumatic valves are present (5-6 bar (72.52-87.02 PSI) system overpressure).

Check whether the plastic stoppers have been removed from the suction pipe of the vacuum generator.

Check that the on/off switch is in position ”OFF".

SM4-618

Start-up 3-1

Image 16
Contents Sterling Material Processing Parts and Service Department Technical service Edition 10/01Sgfe Table of contents Assembly instructions Technical data Spare parts list AccessoriesFunctional description Electrical manualSafety instructions GeneralFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment Concerning these Operating Instructions General InformationConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Key assignment Switching on the control systemSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Setting the basic parameters Blower run on time B17 Error tolerance B22Starting the conveying procedure First conveying operationsViewing Alarm Messages Possible events Fault hopperSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Cleaning/replacing the filter cartridge RespServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Installing the accessories Rotary lobe vacuum pump GDKElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GDK 4 kW Dimension sheet GSVDimension sheet GDS Spare parts list Pos ID-No Designation OptionalAccessories Electrical manual