Sterling SGFE operating instructions Maintenance schedule

Page 27

 

Maintenance schedule

4.2. Maintenance schedule

Initial operation:

Check the rotational direction of the vacuum

 

generators

 

Check the line system

 

Adjust the suction tube

Daily:

Check warning signs on equipment for legibility

 

and completeness

 

Check the oil level in the oiler

 

Empty the water separator

 

Check operating pressure of the plant’s supply

 

network (5-6 bar (72.52-87.02 PSI) system over

 

pressure)

 

Check the oil level in rotary valve pumps

 

Follow the manufacturer’s operating instructions

Weekly/monthly:

Clean the filter cartridge

 

(according to the accumulation of dust)

 

Check that the main switch on the equipment

 

is functioning

Every six months:

Replace the filter cartridge

(according to the accumulation of dust)

Check the settings on the level probes (if present)

Check that all electrical and mechanical connections fit securely

Change oil and oil filters on the rotary valve pumps

Follow the manufacturer’s operating instructions

Lubricate the bearings with high melting-point grease on the rotary lobe vacuum pumps Follow the manufacturer’s operating instructions

SM4-618

Maintenance 4-3

Image 27
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Electrical manual Assembly instructionsTechnical data Spare parts list Accessories Functional descriptionGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentSetting the basic parameters Signal times flap B01Changes only after consultation with Sterling Service Setting the basic parameters Conveying time B05 Line clearing B09Emptying time B14 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system Adjusting the suction tube If conditions points 3 + 4 are not fulfilledIf the conditions points 3 + 4 are fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Installation TransportMaterial feed Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual