Sterling SGFE operating instructions Transport, Installation, Material feed

Page 35

SM4-618

Transport

Install the equipment such that all parts are easily accessi- ble; this facilitates maintenance and repair work.

5.1. Transport

For transport, only the appropriate lifting gear should be used (eg fork lift or work- shop crane).

»Please ensure the adequate carrying capacity of the lifting gear. Please observe all safety regulations for the operation of lifting

gear.

5.2. Installation

The location of the control unit should be chosen so that a clear view of the sepa- rators is guaranteed from the control unit. Thus any malfunctions which arise can be corrected more easily.

»The main switch on the control unit must be freely accessible at all times.

5.3. Material feed

Suction pipes type MV may be tilted by approx. 45 degrees in either direction to the vertical. Additional fastening is not required.

When conveying from the bottom of storage containers (silos), a suction box with 1-3 suction pipes is required.

The connection of the suction pipes must be carried out with a piece of flexible line to provide sufficient movement.

Assembly instructions 5-2

Image 35
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Electrical manual Assembly instructionsTechnical data Spare parts list Accessories Functional descriptionGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentChanges only after consultation with Sterling Service Setting the basic parametersSignal times flap B01 Emptying time B14 Setting the basic parameters Conveying time B05Line clearing B09 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If the conditions points 3 + 4 are fulfilled Adjusting the suction tubeIf conditions points 3 + 4 are not fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Material feed InstallationTransport Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual