1.3. For the operating safety of the equipment

Never change settings if the consequences are not precisely known.

Use only original Sterling spare parts.

Please observe the maintenance schedule.

Keep record of all maintenance and repair work.

Please note that electronic components may be damaged by static discharge.

Check all electrical connections for proper fit before the equipment is taken into operation for the first time and at regular intervals.

Please ensure that the permitted operation temperature lies between 0 °C and +45 °C (32°F and 113°F).

Please ensure that the permitted storage temperature lies between -25 °C and +55 °C (-13°F and 131°F).

Note down all setting data.

After connection to the electricity supply has been made, check the rotational di- rection of the vacuum generators (note the direction indicated by the arrow).

Please ensure that all plugs are correctly plugged in.

The operating instructions of the connected machines must be followed.

All components must be sufficiently grounded.

Please note that a compressed air supply is required for the operation of the unit.

Never set a higher operating pressure than 6 bar (87.02 PSI) for the unit (system overpressure).

Align the suction tubes correctly.

Please note that the maximum permitted ambient and air temperature on entry to the vacuum generator is 40 °C (104°F).

SM4-618

Safety instructions 1-5

Image 11
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Electrical manual Assembly instructionsTechnical data Spare parts list Accessories Functional descriptionGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentChanges only after consultation with Sterling Service Setting the basic parametersSignal times flap B01 Emptying time B14 Setting the basic parameters Conveying time B05Line clearing B09 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If the conditions points 3 + 4 are fulfilled Adjusting the suction tubeIf conditions points 3 + 4 are not fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Material feed InstallationTransport Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual