Sterling SGFE operating instructions Control system, Operation

Page 17

Control system

3.2. Control system

The facility’s control system is factory-programmed. Nevertheless, you have to set specific values (basic parameters) which are dependent on the processed material, for instance.

The set values are saved and remain saved even after switching off or after a po- wer fail. All entries are saved and can also be viewed at a later point in time. All messages are displayed in plain text.

D

C

AB

I: 1 2 3 4 5 6

 

Mo 08:33

 

 

Q: 1 2 3 4

RUN

 

 

ESC

OK

 

E

 

A=Lamp“ope ration”

B=Lamp“alarm”

C = Main switch

D = Key “Reset”

E = Control unit

Switchbox

SM4-618

3.2.1. Operation

The control system is operated via the keys “ESC”, “OK” and the arrow keys (A).

Messages are displayed on a four-line display.

In the first display line the parameter de- signation is displayed.

In the second display line the set value of the parameter is diplayed.

In the last display line the actual value of the parameter is displayed.

B01 : T

 

T = 01.00s

A

Ta= 00.00s

 

ESC

OK

Start-up 3-2

Image 17
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Technical data Spare parts list Accessories Assembly instructionsFunctional description Electrical manualGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentChanges only after consultation with Sterling Service Setting the basic parametersSignal times flap B01 Emptying time B14 Setting the basic parameters Conveying time B05Line clearing B09 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If the conditions points 3 + 4 are fulfilled Adjusting the suction tubeIf conditions points 3 + 4 are not fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Material feed InstallationTransport Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual