5.8. Electrical connection

»

F

The regulations of the local Electricity Board must be observed.

Before connection to the electricity supply, it should be ensured that the supply voltage and the power frequency are in accor- dance with the data on the name plate of the machine.

The electrical connection may only be carried out by Sterling service staff or trained personnel authorised by Sterling.

It is not permitted for other persons to undertake the electrical connection.

Check that the on/off switch is in position ”OFF".

The operating voltage is 480/3/60

Special voltages on request.

Depending on the model, the connected load is up to 11.0 kW.

SM4-618

Assembly instructions 5-7

Image 40
Contents Sterling Material Processing Parts and Service Department Technical service Edition 10/01Sgfe Table of contents Assembly instructions Technical data Spare parts list AccessoriesFunctional description Electrical manualSafety instructions GeneralFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment Concerning these Operating Instructions General InformationConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Key assignment Switching on the control systemSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Setting the basic parameters Blower run on time B17 Error tolerance B22Starting the conveying procedure First conveying operationsViewing Alarm Messages Possible events Fault hopperSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Cleaning/replacing the filter cartridge RespServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Installing the accessories Rotary lobe vacuum pump GDKElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GDK 4 kW Dimension sheet GSVDimension sheet GDS Spare parts list Pos ID-No Designation OptionalAccessories Electrical manual