Sterling SGFE operating instructions Parts and Service Department

Page 2

Please note that our address and phone information has changed. Please reference this page for updated contact information.

These manuals are obsolete and are provided only for their technical information, data and capacities. Portions of these manuals detailing procedures or precautions in the operation, inspection, maintenance and repair of the products may be inadequate, inaccurate, and/or incomplete and shouldn’t be relied upon. Please contact the ACS Group for more current information about these manuals and their warnings and precautions.

Parts and Service Department

The ACS Customer Service Group will provide your company with genuine OEM quality parts manufactured to engineering design specifications, which will maximize your equipment’s performance and efficiency. To assist in expediting your phone or fax order, please have the model and serial number of your unit when you contact us. A customer replacement parts list is included in this manual for your convenience. ACS welcomes inquiries on all your parts needs and is dedicated to providing excellent customer service.

For immediate assistance, please contact:

North, Central and South America, 8am – 5pm CST +1 (800) 483-3919 for drying, conveying, heating and cooling and automation. For size reduction: +1 (800) 229-2919.

North America, emergencies after 5pm CST (847) 439-5855

North America email: acsuscanadacustserv@corpemail.com

Mexico, Central & South America

Email: acslatinamericacustserv@corpemail.com

Europe, Middle East & Africa +48 22 390 9720

Email: acseuropecustserv@corpemail.com

India +91 21 35329112

Email: acsindiacustserv@corpemail.com

Asia/Australia +86 512 8717 1919

Email: acsasiacustserv@corpemail.com

Sales and Contracting Department

Our products are sold by a worldwide network of independent sales representatives. Contact our Sales Department for the name of the sales representative nearest you.

Let us install your system. The Contract Department offers any or all of these services: project planning; system packages including drawings; equipment, labor, and construction materials; and union or non-union installations.

For assistance with your sales or system contracting needs please Call:

North, Central and South America +1 (262) 641-8600 or +1 (847) 273-7700 Monday–Friday, 8am–5pm CST

Europe/Middle East/Africa +48 22 390 9720

India +91 21 35329112

Asia/Australia +86 512 8717 1919

Facilities:

ACS offers facilities around the world to service you no matter where you are located. For more information, please visit us at www.acscorporate.com

United States:

Asia/Australia:

India

 

 

 

ACS Suzhou

ACS India

ACS Schaumburg – Corporate Offices

Gat No. 191/1, Sandbhor Complex

1100 E. Woodfield Road

109 Xingpu Road SIP

Mhalunge, Chakan, Tal Khed,

Suite 588

 

 

Suzhou, China 215126

Dist. Pune 410501, India

Schaumburg, IL 60173

Phone: + 86 8717 1919

Phone: +91 21 35329112

Phone: + 1 847 273 7700

Fax: +86 512 8717 1916

Fax: + 91 20 40147576

Fax: + 1 847 273 7804

Europe/Middle East/Africa:

 

 

 

 

 

ACS New Berlin – Manufacturing Facility

ACS Warsaw

 

2900 S. 160

th

Street

 

 

Ul. Działkowa 115

 

New Berlin, WI 53151

 

Phone : +1 262 641 8600

02-234 Warszawa

Phone: + 48 22 390 9720

Fax: + 1 262 641 8653

Fax: +48 22 390 9724

 

Image 2
Contents Sterling Material Processing Parts and Service Department Technical service Edition 10/01Sgfe Table of contents Functional description Assembly instructionsTechnical data Spare parts list Accessories Electrical manualSafety instructions GeneralFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment Concerning these Operating Instructions General InformationConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Key assignment Switching on the control systemChanges only after consultation with Sterling Service Setting the basic parametersSignal times flap B01 Emptying time B14 Setting the basic parameters Conveying time B05Line clearing B09 Setting the basic parameters Blower run on time B17 Error tolerance B22Starting the conveying procedure First conveying operationsViewing Alarm Messages Possible events Fault hopperSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If the conditions points 3 + 4 are fulfilled Adjusting the suction tubeIf conditions points 3 + 4 are not fulfilled Cleaning/replacing the filter cartridge RespServicing the accessories Assembly instructions Material feed InstallationTransport Suction pipe Pipework Vacuum generator Installing the accessories Rotary lobe vacuum pump GDKElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GDK 4 kW Dimension sheet GSVDimension sheet GDS Spare parts list Pos ID-No Designation OptionalAccessories Electrical manual