Sterling SGFE operating instructions Assembly instructions

Page 34

SM4-618

5. Assembly instructions

»These installation instructions are intended for persons with skills in electrical and mechanical areas due to their training, ex-

perience and received instructions.

Personnel using these installation instructions must be instruc- ted in the regulations for the prevention of accidents, the opera- ting conditions and safety regulations and their implementation.

Ensure in each case that the personnel are informed.

The installation instructions provided in the corresponding ope- rating instructions apply for all connected equipment.

Observe safety regulations with regard to lifting gear handling

All installation work must be carried out with the equipment dis- connected from electrical power and compressed air supply.

L

For installation work taking place at heights of over approx.

 

1829 mm. (6 ft.), use only ladders or similar equipment and

 

working platforms intended for this purpose. At greater

 

heights, the proper equipment for protection against falling

 

must be worn.

 

Use only suitable lifting gear which is in proper working order

 

and load suspension devices with sufficient carrying capaci-

 

ty. Do not stand or work under suspended loads!

 

Use suitable workshop equipment.

 

 

F

Assembly instructions 5-1

Image 34
Contents Sterling Material Processing Parts and Service Department Technical service Edition 10/01Sgfe Table of contents Functional description Assembly instructionsTechnical data Spare parts list Accessories Electrical manualSafety instructions GeneralFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment Concerning these Operating Instructions General InformationConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Key assignment Switching on the control systemSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Setting the basic parameters Blower run on time B17 Error tolerance B22Starting the conveying procedure First conveying operationsViewing Alarm Messages Possible events Fault hopperSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Cleaning/replacing the filter cartridge RespServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Installing the accessories Rotary lobe vacuum pump GDKElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GDK 4 kW Dimension sheet GSVDimension sheet GDS Spare parts list Pos ID-No Designation OptionalAccessories Electrical manual