Sterling SGFE operating instructions Concerning these Operating Instructions

Page 13

Warning Messages and Symbols

2.2. Warning Messages and Symbols

The following warning messages and symbols are used in these operating in- structions:

»

L

F

This symbol indicates danger to life! Fatal or serious injury is possible if the corresponding instructions, regulations or war- nings are not observed.

This symbol indicates that serious injury is possible if the cor- responding instructions, regulations or warnings are not ob- served.

This symbol indicates that extensive damage to equipment is possible if the corresponding instructions, regulations or warnings are not observed.

&

This symbol indicates information important for becoming fa- miliar with the equipment, i.e. technical correlations.

$

This symbol indicates that a technical term is explained at this point.

SM4-618

Concerning these Operating Instructions 2-2

Image 13
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Technical data Spare parts list Accessories Assembly instructionsFunctional description Electrical manualGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual