Sterling SGFE operating instructions Technical data

Page 43

SGFE

7. Technical data

Version: 64.10-0198GB05TD 02/01

Method of filling: . . . . . . . . . . time conveying mode or probe conveying mode

. . . . . . . . . . . . . . . . . . . . . . . . . . with conveying time used as monitoring time

Vacuum generator (depending on the model)

Side vane vacuum pump GSV: . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5-4.4 kW

Noise level: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . approx. 75-78 dB(A)

Rotary valve pump GDS: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0-11.0 kW

Noise level: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . approx. 73-75 dB(A)

Rotary lobe vacuum pump GDK: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 kW

Noise level: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . approx. 78 dB(A)

Operating voltage (standard): . . . . . . . . . . . . . . . . . . . . . . . . 400 V/3 AC/50 Hz (other voltages possible)

Permissible storage temperature: . . . . . . . . . . . . . . . . . . . . . . . . -25 to +55 °C

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (-13° to +131° F)

Permissible operating temperature: . . . . . . . . . . . . . . . . . . . . . . . . 0 to +45 °C

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (32° to +113°F)

SM4-618

Technical data 7-1

Image 43
Contents Sterling Material Processing Parts and Service Department Edition 10/01 Technical serviceSgfe Table of contents Electrical manual Assembly instructionsTechnical data Spare parts list Accessories Functional descriptionGeneral Safety instructionsFor your safety For your safety General For your safety Assembly For your safety Operation For the operating safety of the equipment General Information Concerning these Operating InstructionsConcerning these Operating Instructions Explanations and Definitions Concerning these Operating Instructions Start-up Control system Switching on the control system Switching on the control system Key assignmentSignal times flap B01 Setting the basic parametersChanges only after consultation with Sterling Service Line clearing B09 Setting the basic parameters Conveying time B05Emptying time B14 Error tolerance B22 Setting the basic parameters Blower run on time B17First conveying operations Starting the conveying procedurePossible events Fault hopper Viewing Alarm MessagesSwitching off the unit Maintenance General Maintenance schedule Maintenance schedule Checking the direction of rotation of the vacuum generator Testing the conduit system If conditions points 3 + 4 are not fulfilled Adjusting the suction tubeIf the conditions points 3 + 4 are fulfilled Resp Cleaning/replacing the filter cartridgeServicing the accessories Assembly instructions Transport InstallationMaterial feed Suction pipe Pipework Vacuum generator Rotary lobe vacuum pump GDK Installing the accessoriesElectrical connection Functional description General Technical data Technical dataDimension sheet Sgfe Dimension sheet GSV Dimension sheet GDK 4 kWDimension sheet GDS Spare parts list Optional Pos ID-No DesignationAccessories Electrical manual