Starting the conveying procedure
3.5. Starting the conveying procedure
Set the on/off switch in position ”ON”.
&
If the hopper loader reports a lack of material, the conveying is started.
3.6. The first conveying operations
F
Check the rotational direction of the vacuum generators.
Check the line system.
Adjusting the suction tube.
Material coming from the hopper loader during the first con- veying may not be used.